27
6.2 Prepare Sterilization
A.
Follow “4. Installation” to finish installation first.
B. Foll
ow “4.2 Install the sterilizer” to make sure the water inside reservoir is sufficient.
C. Check the Pressure Gauge is reading ZERO, and then open the door by turning the door
knob 90° counterclockwise.
D. Place the items to be sterilized and the sterilization indicator strips
(
into the box as required. Remember to open both side windows before placing the box into
the sterilizer as Figure 39.
Figure 39
CAUTION:
Before loading, ensure instruments are cleaned and rinsed.
WARNING:
Refer to “11. Specifications” for the maximum permissible load. Failure to
follow these instructions may cause the sterilizer to malfunction and result in
an unsuccessful sterilization cycle.
E. Close the door and turn the knob clockwise 90° to lock.
F.
Press the “POWER” switch to ON “I” position, the power indicator light should illuminate.
The “DOOR OPEN” indicator light should be off.
WARNING:
The door must be closed completely during operation of the unit. If the
“DOOR” indicator light illuminates, it means that the door is not closed
properly.
Figure 40
The cover must be put on during
sterilization.
Open both side windows before
placing the box into the chamber.