38
WARNING:
Check the Pressure Gauge is reading ZERO before opening the door.
(Optional) MA-R series
Figure 54
F. Press
to start “PUMP TEST Program”. The corresponding sterilization time will be:
Sterilization Time
NA
Sterilization Temperature
NA
Dry Time
NA
Vacuum Time
10 min.
Wait
15 min.
G. Press the START Button
and the sterilizer will automatically run through the selected
program. The current progress of the sterilization cycle is indicated by the illuminated LED
on the Process Status Indicator. (Figure 53)
Note: The DRY step won’t be performed.
Figure 55
0 bar
(kgf/cm
2
)
Vacuum