![Apec Water ESSENCE ROES-PHUV75 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/apec-water/essence-roes-phuv75/essence-roes-phuv75_installation-instructions-and-owners-manual_2952292032.webp)
29
Part II: Trouble-Shoot Guide
For Newly Installed RO System
After installation, if you encounter any of the problems described below, please follow this guide to trouble-
shoot. In most cases, the problem is quickly solved by following this guide.
ROES-PHUV75 System’s Head Diagram
52(66\VWHP¶V+HDG3RLQWV,GHQWL¿FDWLRQ
Point A
: Feed water inlet into Stage-1 filter (red tubing)
Point B
: Stage-3
filter’s
output
port
Point C
: Automatic-Shut-Off (ASO) valve.
Point D
: Stage-4 Membrane housing
inlet
port. Feed water from stage-3 filter enters the Membrane at
this port.
Point E:
Check Valve. The filtered water from the Membrane passes through this Check Valve
before entering the storage tank. The Check Valve blocks the tank water from back-flowing into
the membrane.
Point F:
T-fitting on Stage-5 UV filter. This end of the T-fitting connects to the CLEAR pure water line
C4
.
Point G:
T-fitting on the Stage-5 UV filter. This other end of the T-fitting connects to the YELLOW pure
water line which goes to the tank’s valve.
Point H:
The output end of Stage-6 filter. Pure water leaves Stage-6 filter via this port, and flows into
stage-7 pH mineral filter.
Point I
: UV light input point.
Point J
: UV light output to Stage-6 carbon filter.
Point O
: The inlet end of Stage-7 pH filter.
Point P
: The output end of Stage-7 filter. Pure water leaves Stage-7 pH mineral filter via this port, and
flows onto the dispensing faucet.
Fig. 17
To Storage
Tank
Yellow Tubing
Red Tubing
From Water Source
29
Part II: Troub
b
l
l
e
e
-
-
S
Sh
hoot Guide
For Newly I
I
n
n
s
st
t
a
a
l
l
l
ed RO System
y
y
Af
f
te
te
r
r in
in
st
st
al
a
lation, if you encounter any o
o
f
f
th
th
e pr
pr
ob
ob
l
lems described below, please
f
f
ol
ol
lo
low
w
th
this guide to trouble-
sh
sh
oo
oo
t.
t
In most cases, the problem is q
q
ui
ui
ck
ckly
ly s
s
ol
l
ved by following this guide.
RO
R
ES-PHUV75 System’s Head Diagram
52(66\VWHP¶V+HDG3
HQWL¿FDWLRQ
Point A
: Feed water inlet into Stage-1 filter (red tubing)
Point B
: Stage-3 filter’s
output
port
Point C
: Automatic-Shut-Off (ASO) valve.
Point D
D
:
:
St
St
age-4 Membrane housing
inlet
por
or
t.
t.
F
Fe
eed water from stage-3 filter ente
e
rs
rs t
t
he
he Membrane at
this port.
Po
Po
in
in
t
t E:
Check Valve. The filtered wa
a
te
te
r
r fr
from
o
the Membrane passes through
gh t
t
hi
his
s
Ch
C
eck Valve
before entering the storag
age
e
ta
ta
nk
nk. The Check Valve blocks the tank
nk
w
wa
ater from back-flowing into
VV
the membrane.
Point F:
T-fitting on Sta
a
ge
ge-5
-5
U
U
V
V
filter. This end of the T-fitting conn
nn
ec
ects
ts
t
to
o the CLEAR pure water line
rr
C4
.
Point G:
T-fitting on the
e S
S
ta
ta
ge
ge
-5 UV filter. This other end of the T-fitting connects to the YELLOW pure
rr
water line which goes to the tank’s valve.
Point H:
The output end of Stage-6 filter. Pure water leaves Stage-6 filter via this port, and flo
o
ws
ws i
i
nt
nto
stage-7 pH mineral filter.
Point I
:
UV light input point.
Po
o
in
in
t
t
J
J
:
:
UV light output to Stage-6 car
r
bo
bo
n
n fi
filt
lt
er.
P
Poi
oi
nt O
: The inlet end of Stage-7 p
p
H
H
fi
fi
lt
lt
er.
Point P
: The output end of St
t
ag
ag
e-
7
7 fi
f
lter. Pure water leaves Stage-7 pH
H
mi
mine
neral filter via this port, and
flows onto the dispe
pens
nsin
in
g
g faucet.
V75 System s Head Diagram
P¶V+HDG3RL
L
QW
QW
V
V
,G
,G
HQWL¿FDWLRQ
Fig. 17
To Storage
Tank
Tubing
Yellow
r Source
Red Tubing
From Water