![Apec Water ESSENCE ROES-PHUV75 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/apec-water/essence-roes-phuv75/essence-roes-phuv75_installation-instructions-and-owners-manual_2952292018.webp)
15
Stage
6
th
Stage
4
th
Stage
1
st
Stage
2
nd
Stage
3
rd
Stage
5
th
Stage
7
th
DRAIN
LINE
1
st
Stage - Sediment pre-
r
2
nd
Stage - Carbon block pre-
r
3
rd
Stage - Carbon block pre-
r
4
th
Stage - Membrane
5
th
Stage - UV light
6
th
Stage -
7
th
Stage - Inline pH plus filter
Inline carbon
r
WASTE WATER
INPUT WATER
DRINKING
WATER
TO ICEMAKER OPTION
W
G
P
A
Z
Y
DRINKING WATER FAUCET
SINK
Option 1 Diagram
Fig. 11A
Details on Tubing Connections:
To ensure a smooth and correct installation, please connect the water lines
following the sequence and
order
outlined below. Refer to
Fig.11 & 11A
for proper point locations.
1. Point Z - Faucet connection:
Tubing color: Clear tubing. Connect the CLEAR tubing to the base of the RO faucet.
Fitting type: Quick Connect Fitting: Simply push Clear Tubing into Quick Connect Fitting. No Insert,
Sleeve or Nut needed here. (Attach threaded and of faucet adapter to the faucet metal
stem. No teflon tape needed here). See
Fig.9A (Page 11)
2. Point X - Feed water connection:
Important:
Insert and sleeve Must be installed to prevent water leaking. Metal compression nut must be
fully tightened! (See
Page 8
)
Tubing color: Red tubing. Connect the RED tubing to the Feed Water Needle Valve.
Fitting type: See
Fig. 5C (Page 8).
Metal compression nut fitting. Use
plastic sleeve.
Add
“insert”
to tubing. No teflon tape here. Tighten nut with wrench.
15
Stage
6
6
t
th
Stage
4
th
Stage
1
st
Stage
2
nd
Stage
3
rd
Stage
5
5
th
th
Stag
Stage
e
g
7
7
th
th
DRAIN
LINE
1
st
St
ag
age
e - S
S
edi
edi
m
ment pre-
r
2
nd
St
t
ag
age -
e - C
C
arb
arb
o
on block pre-
r
3
rd
Stage -
e
C
C
arb
ar
on block pre-
r
4
th
Stage - Membrane
5
th
Stage - UV light
6
th
Stage -
7
th
Stage - Inline pH plus filter
Inline carbon
r
WASTE WATER
A
A
INPUT WATER
A
A
DRI
DRINKI
NK
NG
NG
WA
WATER
TER
A
A
A
TO
T ICEMAKER OPTION
W
G
P
P
P
A
A
Z
Z
Y
Y
DRINKING WATER
A
A
FAUCET
SINK
O
O
p
p
ption 1 Diagram
Fig. 11A
Details on Tubing Connections:
To ensur
ure
e
a
a smooth and correct installation, pleas
s
e
e
co
c
nnect the water lines
following th
th
e
e
se
seq
quence and
orde
e
r
r
o
out
ut
l
lined below. Refer to
r
Fig.11 & 11A
A
f
f
or
or p
p
r
roper point locations.
A
A
1.
1. P
Point Z - Faucet connection:
Tubing color: Clear tubing. Co
o
nn
nn
e
ect the CLEAR tubing to the base of th
he
e
RO
RO faucet.
Fitting type: Quick Connect
t Fi
Fi
tt
tt
i
ing: Simply push Clear Tubing
g in
in
to
to
Q
Qui
i
ck Connect Fitting. No Insert,
Sleeve
o
o
r
r Nu
Nu
t
t
ne
ne
eded here. (Attach threaded an
d
d
of
of f
f
au
au
cet adapter to the faucet metal
stem.
No
No t
t
ef
ef
lo
lo
n tape needed here). See
Fig.9A (Pa
Page
ge 11)
2. Point X - Feed water connection:
Important:
Insert and sleeve Must be installed to prevent water leaking. Metal compression nu
nut
t
mu
must be
fully tightened! (See
Page 8
)
Tu
Tubi
bi
ng
ng color: Red tubing. Connect the RE
RE
D
D
tu
tu
bing to the Feed Water Needle Valv
ve.
e.
Fi
Fitt
t
ing type: See
Fig. 5C (Page 8)
).
Me
Meta
ta
l
l compression nut fitting. Use
plas
s
ti
tic
c sl
l
eeve.
Add
“insert”
to tubing
ng.
.
No
No teflon tape here. Tighten nut with
h
wr
wr
en
en
ch
ch
.