![Apec Water ESSENCE ROES-PHUV75 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/apec-water/essence-roes-phuv75/essence-roes-phuv75_installation-instructions-and-owners-manual_2952292017.webp)
14
Summary of Tubing Connections:
There are 4 connections: See Fig. 11. & Fig. 11A.
Point
A
to
X
: Connect RO to COLD water supply —
Red
tubing.
Point
G
to
Y
: Connect product water from 5
th
-stage UV Light to tank —
Yellow
tubing. This tubing is a
2-way line, Product water enters and leaves the tank via this line.
Point
P
to
Z
: Connect product water from 6th-stage pH filter output to RO faucet —
Clear
tubing.
Drain line to
W
: Connect waste water from 4
th
-stage membrane to drain outlet —
Black
tubing.
Fig. 11
Fig.10E
To Disconnect the Tubing:
See
Fig.10B
. Push in and hold down on the collet ring square
against the fitting. With the collet held in this position the tube can
be removed. See
Fig.10E.
Important!
Insert and sleeve Must be installed to prevent water leaking. Metal compression nut must be
fully tightened! (See
Page 8
)
14
Summary of Tubing Connections:
There are 4 connections: See Fig. 11. & Fig. 11A.
Point
A
to
A
X
: Co
o
nn
nnec
ec
t
t RO to COLD water supply —
Re
e
d
d
t
tub
ub
in
ing.
Point
G
to
Y
Y
:
: Co
Connect product water from 5
th
-stage
ge U
U
V
V Light to tank —
Yellow
tubing. Thi
i
s
s tu
tu
bi
bi
n
ng is a
w
2-way li
i
ne
ne,
,
Pr
Pr
oduct water enters and leaves the ta
tank
nk
v
ia this line.
Po
o
in
in
t
t
P
t
t
o
Z
: Connect product water from
m
6
6
th
th
-s
-s
ta
ta
ge pH filter output to RO fauc
c
et
et —
—
Cl
Cle
ear
tubing.
r
Dr
Dr
ai
a
n line to
W
: Connect waste wate
r
r
fr
fr
o
om 4
th
-stage membrane to drain outle
et
t
—
—
Bl
Bl
a
ack
tubing.
k
Fig. 11
Fig.10E
To Disco
nn
nn
ec
ect the Tubing:
g
See
Fi
Fi
g.10
1
B
. Push in and hold down on the col
ol
le
le
t
t
ri
r
ng square
ag
ag
ai
ains
nst
t t
the fitting. With the collet held in
in
t
t
hi
hi
s
s
po
o
sition the tube can
be
be
r
re
emoved. See
Fig.10E.
Important!
Insert and sleev
ve
e
Mu
Mu
st
st b
b
e installed to prevent water leaking. Metal compression nut must be
fully tightened! (See
Page
8
8
)
)