background image

The Aoyue Int 883 IR­Preheating System is  a reworking equipment that com­ 

bines infrared (IR) heating technology, enhanced pre­heating area, versatile board 

holder, and profile control of heating in one sophisticated package. It is  designed 

for  reworking  double­sided,  diverse  technology  printed  circuit  boards  (PCB) 

which  utilizes traditional or lead free solder. 

The system is equipped with a high powered IR­heating elements combined 

with  multiple  types  of  preheating  operation  with  built  in  safety  control  of  heat 

and over heat protection.  Finally, the unique, innovative design with digital con­ 

trol panel offers precision, safety, and ease of use to meet all reworking 

requirements.

 

PRODUCT DESCRIPTION 

FUNCTIONS and FEATURES 

 

Microprocessor­controlled ESD safe unit. 

 

Utilizes infrared heat wave technology. 

 

Versatile board holder. To fit various board types 

 

Enhanced pre­heating area to fit large PCBs. 

 

Widely used for reworking BGAs, micro BGAs,  QFPs, PLCCs, SOICs, small SMD, 

and other circuit board components. 

 

Large pre­heating area minimizes board warping 

 

Easy­to­adjust  pre­heat temperatures with digital display. 

 

Built in extra temperature sensor for more accurate monitoring of board temperature. 

 

Built­in temperature sensor for stable (temperature) measurements. 

 

Closed loop system for precise temperature control. 

 

Profile  adjustment  functionality  for  automating  reworking  tasks  under  user 

defined temperature  and  time settings. 

 

Three modes of operation to suite different reworking requirements. 

 

Temperature  and  Profile  settings  are  stored  into  CPU  memory  for  easy 

configuration. 

 

Compatible for use with either  hot air or IR top heating systems.

 

OPERATING PROCEDURES 

D.  TYPE “1”  OPERATION 

Before proceeding with this type of operation, attach the first external 

temperature  probe  to  the  underside  of  the  PCB  to  be  worked  on.  The 

second probe can be placed near areas of interest. 

This type of operation utilizes the first external temperature sensor to 

control the heat.  Using this type of operation allows us to closely control 

the  temperature  at  board  level.  While  freeing  up  the  second  external 

temperature probe for additional monitoring. 

1. 

To  set  the  desired  temperature  press  the  selection  button 

repeatedly  until the  top  display  shows “

Set

”. The bottom  display 

would show the current set temperature followed by a suffix “

A

”. 

2. 

Press  the  increase  or  decrease  button  to  adjust  the  set 

temperature  level.  The  set  temperature  is  adjustable  from  50  to 

280 C in this type of operation. 

3. 

For  this  type  of  operation  we  must  closely  monitor  the  actual 

temperature of  the  first  external  temperature  probe.  To  view the 

actual  temperature  readout  of  this  probe  repeatedly  press  the 

selection button until the top display shows the word “

Act1

”, and 

the bottom  display shows the actual temperature of first external 

temperature probe followed by a suffix “

b

”. 

4. 

To  view  the  temperature  of  the  second  external  temperature 

probe  or  simultaneously  view  both  external  temperature  probe's 

temperature: 

 

Repeatedly press the  selection button until the top display shows 

Act  2

”  and  bottom’s  suffix  shows  “

c

”  this  displays  the  second 

temperature probe. 

 

Repeatedly press the selection button until the top shows the first 

temperature  probe  with  suffix  “

b

”  and  the  bottom  shows  the 

second temperature probe with suffix “

c

”. 

5. 

Under  type “

1

”  mode  of  operation  it  is not  necessary  to  monitor 

the internal temperature sensor’s read out.

Содержание INT883

Страница 1: ...hows err2 internal temperature connector might have come loose or needs to be replaced If err messages shows err3 the first external temperature probe was not detected secure the external temperature on the underside of the board to be worked on PROBLEM 3 DISPLAY AND OTHER DEVICE OPERATION ISSUES SOLUTION Turn off power and back on OTHER PROBLEMS NOT MENTIONED Contact the vendor IR Preheating Syst...

Страница 2: ...3 degrees per second Therefore based on your set time the maximum temperature may not reach 250C Profile analysis SEG1 SEG2 SEG3 SEG4 SEG5 SEG6 050t 060t 080t 050t 040t 60t 100C 150C 180C 190C 195C 100C Segment one is set to 50 seconds to reach 100C Which means after 50seconds at the end of segment one the temperature should reach 100C Then Segment two is set to 60 seconds to reach 150C which mean...

Страница 3: ...the profile repeatedly press the selection button until the display shows the word Run Prof then press the increase button A 3 second countdown will commence before automated reworking starts 5 To see the running time or current segment the system is processing or the temperature of the external temperature probes repeatedly press the selection button to switch between different views Follow the s...

Страница 4: ...with either hot air or IR top heating systems 9 OPERATING PROCEDURES D TYPE 1 OPERATION Before proceeding with this type of operation attach the first external temperature probe to the underside of the PCB to be worked on The second probe can be placed near areas of interest This type of operation utilizes the first external temperature sensor to control the heat Using this type of operation allow...

Страница 5: ...play shows the word Act2 and the bottom display shows the actual temperature of second external temperature probe followed by a suffix c 6 To simultaneously view the actual temperature read by the first and Second external temperature probe repeatedly press the selection button until the top display shows the actual temperature of first external temperature probe followed by a suffix b and the bot...

Страница 6: ...ower source 5 To turn the unit ON Toggle the main power switch to ON position 7 on control panel guide B OPERATION TYPE MODE SELECTION 1 Follow initial procedures A INITIAL PROCEDURES 2 The display would show TYPE 0 which means Type 0 operation will be used To select between types 0 to 2 Press the increase or decrease buttons 3 4 of control panel guide 3 To confirm selection and enter into operati...

Отзывы: