Model
50L31
Document No.
ITCT0217
Version
v5.1
Panel
V500HJ1-LE1 Rev.Cx
Effective from
2013-9-10
Date Updated
2013-9-10
NO
Amount
Diagram
Tool Parameters
1
Figure 1
2
Figure 1
3
Figure 1
4
Figure 1
5
Prepared by
Reviewed by Approved by
Zhang Wei
Check whether wires are inserted in place.
Check whether 4PCS panel-pressing plate and 4PCS panel buckle are
locked in place.
When finished, step on the switch with foot and send the product to
next station.
Notice
1. Wastes produced by this station shall be placed in the assigned position. Refer to
Waste Classification and Disposal List
.
Check whether screws are fastened in place.
Check whether viscose tapes are stuck in place.
Unit Assembly 17
Part Number
Descriptions
Operations and Requirements
Station Name
Process Inspection
Section/Serial No.
2.Specific standards refers to
LCD Inspection Code, Plastic Inspection Code
and
Factory Order
Figure:
Project Controlled Seal
Recent
Modification
Record
Please read and understand the
operating instructions carefully
17
12V MSD318QT-LF scheme
mainboard
Figure 1
Process Inspection Requirements:
1.Connection wires being missed to insert, misplaced, inserted reversely
or inserted not in place are not allowed and also do not touch high-power
components such as power board and mainboard.
2. Screws can not be missed to install, tilted or made loose; do not drop
any screw into PCB board or power board.
3.Keyboard not locked into place or keys hard to be pressed is not
allowed.
4.Viscose paper must be attached in the shape of
“Ω”
, without edges and
corners curling up.
5.Connection wires in the machine must be strictly arranged according to
the process requirements and keep all wires away from transformer and
cushion.
6.Check whether the connecting wires are inserted in right place.
7.Make sure no any sundries are left in the machine.
8.Do not change the technical and scheme.
9.Make sure no abnormalities in machine.
Содержание LE50H264
Страница 27: ...Operation Instructions ...