![Anywave ATSC 1KW Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/anywave/atsc-1kw/atsc-1kw_quick-start-manual_2949028011.webp)
ATSC 1KW TX Quick Start Guide
ACT-1000-QSG-DOC-V1.6, 9/12/2014
Page 11 of 23
6
RF System Connections
Once the TX cabinet is in position, the next step is to install the RF system and
connect the TX to the Antenna feed or a suitable station load before proceeding
further.
1.
Mechanically mount BPF on top of TX cabinet
If you purchased an Anywave BPF, it is designed to be installed and mounted on
top of the 1KW TX cabinet (as shown below). Four metal stand-offs “feet” with
mounting hardware are supplied with the BPF to allow it to be fastened and secured
to four holes located in the top panel of the cabinet. Before securing the BPF with
the screws provided, please execute step 2 below, as you will need to be able to
move (slide) the BPF into place, and then apply the mounting screws.
1 – Mount BPF
2 – Connect Elbow and
Directional Couplers