VERTICAL CONTACT TOASTER
11
P/N 1011373 Rev. C 03/18
McDonald’s
MAINTENANCE (CONTINUED)
Checking the Conveyor Belt Chains
(Every 3–6 Months)
MEASURING CONVEYOR BELT CHAINS
1. Turn the unit off, unplug the power cord, and
allow the unit to cool.
2. Remove the Bun Feeder, Butter Wheel and Pan
(if present), and Bun Chute (Figure 2). Set the
Bun Thickness Compression Knobs to 6 & 6.
3. Open both Conveyor Covers.
4. Remove the Belt Wraps and set aside (Figures 7
& 8).
5. Facing the toaster, locate the approximate center-
point of the Conveyor Belt Chain.
6. Pull the chain away from the edge of the toaster
(Figure 8).
7. Measure the distance from the frame of the unit
and the chain. A U.S. Dime (1.8 cm) can be used
for the measurement (Figure 8).
8. If the gap is 2 times wider than the coin or larger
than 3.6 cm, remove one 1/2” link as described
below.
9. Disconnect the chain by squeezing any two links
together and unhook the links from each other
(Figure 9). Needle-nose pliers may be used.
NOTE: There are two small 1/2” links on each side
of the Conveyor Belt Chain. The rest are large 3/4”
links.
10. Remove one 1/2” link from the chain.
11. Reassemble the chain onto the sprockets as
described in the
Replacing Conveyor Belt Chains
section of this manual.
12. Measure the gap again with the coin. The coin
should fit snuggly between the chain and frame.
13. Check the opposite side of the toaster using the
same steps.
14. When finished, reassemble the unit and return to
operation.
NOTE: If the ends of the Conveyor Belt Chain can-
not be connected, remove an additional small 1/2”
link and install a large 3/4” link in its place.
REPLACING CONVEYOR BELT CHAINS
1. Turn the power off, unplug the power cord, and
allow the unit to cool before proceeding.
2. Remove the Butter Wheel and Pan (if present),
and Bun Chute and set the Compression Control
Knobs to 6 & 6.
3. Open both Conveyor Covers.
4. Remove both Belt Wraps and set aside.
5. Disconnect the Conveyor Belt Chain by squeezing
any two links together and unhook both ends of
one link (Figure 9). Repeat on other side.
6. Place the new chain on the top sprockets with
hook ends down.
NOTE: The ends of the hooks must point down
(Figure 9).
7. Wrap the chain around the top and lower sprock-
ets. Hook both ends together. Repeat on other
side.
NOTE: Install the Conveyor Belt Chains under the
upper and lower Support Rods.
8. If the Belt Wraps are in good condition, reinstall.
Otherwise install new Belt Wraps.
9. Close the Conveyor Covers, set the Bun
Thickness Compression Knobs back to their
normal settings and reinstall the Butter Wheel and
Pan (if present), Bun Feeder, and Bun Chute.
Figure 8. Measuring Conveyor Belt Chain
Figure 9. Removing Conveyor Belt Chain
Rotation
Upper Support Rod
Large Link
P/N 0800121
Small Link
P/N 0800204
Содержание VCTM-2
Страница 21: ...VERTICAL CONTACT TOASTER 21 P N 1011373 Rev C 03 18 McDonald s WIRING DIAGRAM ...
Страница 22: ...VERTICAL CONTACT TOASTER 22 P N 1011373 Rev C 03 18 McDonald s NOTES ...
Страница 23: ...VERTICAL CONTACT TOASTER 23 P N 1011373 Rev C 03 18 McDonald s NOTES ...
Страница 24: ... 1 630 784 1000 1 800 253 2991 1 630 784 1650 86 512 6841 3907 86 512 6841 3637 ...