C96IB01
57
EN
2.
Empty the measuring cell by pressing the pump lever.
3.
Open the pump lock and remove the pump.
Fig. 11 - 1
Removing the pump
4.
Screw out the screw of the pump lock using an Allen key size 2.5 and remove
the screw.
Fig. 11 - 2
Removing the pump lock screw
5.
Remove the pump lock by sliding it outwards.
Содержание 84138
Страница 2: ......
Страница 3: ...C96IB01 3 EN DMA 35 Portable Density Meter From Firmware Version V1 79 Instruction Manual ...
Страница 72: ...72 C96IB01 EN Appendix C CE Declarations of Conformity ...
Страница 73: ...C96IB01 73 EN ...
Страница 74: ...74 C96IB01 EN Appendix D EC Type Examination Certificate ...
Страница 75: ...C96IB01 75 EN ...
Страница 76: ...76 C96IB01 EN Appendix E RFID Module Test Reports ...
Страница 77: ...C96IB01 77 EN ...
Страница 81: ...C96IB01 81 DE DMA 35 Tragbares Dichtemessgerät Ab Firmwareversion V1 79 Betriebsanleitung ...
Страница 153: ...C96IB01 153 DE Anhang C CE Konformitätserklärung ...
Страница 154: ...154 C96IB01 DE ...
Страница 155: ...C96IB01 155 DE Anhang D EG Baumusterprüfbescheinung ...
Страница 156: ...156 C96IB01 DE ...
Страница 157: ...C96IB01 157 DE Anhang E RFID Modul Testreports ...
Страница 158: ...158 C96IB01 DE ...