Antaira Technologies - Industrial Ethernet Switches
LNX-1204G-10G-SFP Hardware Manual V1.0
17
4. Hardware Installation
4.1 Installation Steps
This section will explain how to install
Antaira’s LNX-1204G-10G-SFP:
Caution:
This device is intended for use indoor.
Attention:
Cet appareil est destiné à être utilisé à l'intérieur.
Caution:
The device is intended to be installed in an industrial control enclosure and
panel.
Attention:
L'appareil est destiné à être installé dans une armoire de commande et un
panneau industriels.
Installation Steps
1. Unpack the industrial Ethernet switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.
•
If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the
DIN-Rail Mounting
section for DIN-Rail installation.
•
If you want to wall mount the industrial Ethernet switch, please refer to the
Wall
Mounting
section for wall mounting installation.
3. To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the
Mounting
Installation
section.
4. Power on the industrial Ethernet switch and then the power LED light will turn on.
•
If you need help on how to wire power, please refer to the
Wiring the Power Inputs
section.
•
Please refer to the
LED Indicators
section for LED light indication.
5. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one side of the RJ-45 cable into
switch’s Ethernet port and on the other side into the
networking
device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) LED
on the industrial Ethernet switch will turn on when the cable is connected to the networking
device.
•
Please refer to the
LED Indicators
section for LED light indication.
7. When all connections are set and the LED lights all show normal, the installation is complete.