
5.2.3 Precautions at the end of work
1.
At the end of operation, please lift the rotating arm to make
the
motor park at the upper position. As shown in the figure below:
2.
After operation, the
hammer
shall be covered with
a tarp
to
keep the pile driver free from wind and rain.
3.
For maintenance management such as routine inspection and
regular inspection, please follow the contents of Chapter 5.
P31
Содержание AT 75 B
Страница 1: ...2021 Operation Manual Side Grip Vibro Hammer...
Страница 10: ...1 1 2 3 4 5 6 7 8 9 10 P8...
Страница 11: ...1 4 Specification 1 4 1 Product Dimensions P9 102 12 inches 51 49 inches 50 23 inches...
Страница 15: ...P13...
Страница 28: ...P26...
Страница 48: ...clamp plate should be tight check the oil level of gear box Oil level should be in center of sight glass P46...
Страница 52: ...Chapter 10 Hydraulic Diagram P50...