
3-8 High-Band Calibration Port 1 – Port 2
Using the PVS Software with the ME7838A4/A4X/E4/E4X
3-26
PN: 10410-00784 Rev. A
3656C W1 Cal/Ver Kit & 2300-616-R PVS UG
5.
The
VNA Calibration: Step 4 of 5
dialog box appears.
a.
Connect the Male 3.18 mm Short #3 to VNA Port 1.
b.
Connect the Female 2.02 mm Short #1 to VNA Port 2.
c.
When ready to proceed, click
OK
.
6.
The
VNA Calibration: Step 5 of 5
dialog box appears.
a.
Remove the offset Shorts from Port 1 and Port 2.
b.
Slide the two T-R modules towards each other and connect the VNA Port 1 (Female) to VNA Port 2
(Male) directly.
c.
When ready to proceed, click
OK
.
7.
The program execution continues to
Section 3-9 “Application Interface – Main Menu Tab” on page 3-27
.
Figure 3-41.
VNA Calibration: Step 4 of 5 Dialog
Figure 3-42.
VNA Calibration: Step 5 of 5 Dialog
Содержание 3656C W1
Страница 2: ......
Страница 8: ...Contents 6 PN 10410 00784 Rev A 3656C W1 Cal Ver Kit 2300 616 R PVS UG...
Страница 163: ......