ES
FR
DE
GB
IT
C139
6195
0
ID
M
English
-
30
-
Use and installation manual
The constructor has tested the appliance with its own
mains gas, identified by the sticker applied to the
nameplate.
If the type of gas to be connected is different from
that used for testing, proceed as follows.
1 –
Turn off the gas supply tap
(A)
.
2 –
Change the burner nozzle (see page 33).
3 –
Remove the testing gas sticker from the
dataplate
(B)
and apply the new one to identify the
gas being used.
4 –
Remove the sticker from the appliance and apply
the new one
(C)
with the category of the country of in-
stallation.
5 –
Start the "Conversion of gas supply" procedure.
6 –
Carry out the appliance testing procedure (see
page 30).
Important
On completion of the operation, make sure that
there are no gas leaks or malfunctions.
Important
Before it is put into service, the system must be tested to check the operating
conditions of every single component and identify any malfunctions. In this
stage, it is important to check that all health and safety requirements have been
complie.d with in full.
To test the system, make the following checks.
1 –
Turn on the gas and water supply taps and check that the connections are tight.
2 –
Turn on the master switch to check the electrical connection.
3 –
Check that the mains gas is the same as that used for commissioning of the appli-
ance, and carry out the conversion procedure if necessary (see page 30).
4 –
Check that the gas pressure conforms to the values stated in the table at the back
of the manual.
5 –
Check that the combustion exhaust gases comply with the requirements (see page
6 –
Check the water pressure and adjust if necessary (see page 32).
7 –
Check that the safety device is operating correctly.
8 –
Carry out a cooking cycle without food to ensure that the appliance is operating
correctly.
After testing, if necessary instruct the user in all the skills necessary for putting the ap-
pliance into operation in conditions of safety, in accordance with legal requirements.
Important
During performance of the test procedure and on completion of the operation,
make sure that there are no gas leaks or malfunctions.
CONVERSION OF GAS SUPPLY
TESTING OF THE APPLIANCE
G20
TYPE
CE n.
~
~
~
01
0051
rif.
G25
G30
G31
kW
m3/h
m3/h
Kg/h
mbar
mbar
mbar
mbar
Kg/h
kW
kW
kW
G20
TYPE
CE n.
~
~
~
01
0051
rif.
G25
G30
G31
kW
m3/h
m3/h
Kg/h
mbar
mbar
mbar
mbar
Kg/h
kW
kW
kW
AT: II2H3P
IS-MT: I3B/P
IT-AL-BG-CH-CZ-ES-GB-GR-HR-IE-MK-PT-RO: II2H3P - PL: II2E3P
NL: II2L3P
LU: I2H
LU: I3+
G30/G31 28-30/37mbar (3+)
G20 20mbar
(2H) (2E)
BE: II2E(S)B3P - FR: II2Esi3P
FR:
G31 37mbar (3P)
HU: II2HS3B/P
G30/G31 28-30/37mbar (3+)
AT-CH: II2H3B/P DE:II2E3B/P
NL-RO: II2L3B/P
IDM-39619300800.tif
B
C
A