Reflector to
Ground Mount
Assembly
Step 1
28
Installation Procedures
Using 5/8” shackles, attach four 16 foot chokers provided to reflector lifting lugs. Lift
reflector as shown in Figure 18.
Figure 18
16 Ft Choker
(4 Straps)
Tag
Lines
206278
Lifting Tab
Reference Drawing 240299
The ground mount assembly is now completed with the necessary essentials. All ground
mount options have separate instructional bulletins located in the parts kit that contain
the option.
The next step in the installation process is the reflector assembly. Proceed to the next
step to begin installation of the reflector.