![Andrew 4.9-Meter Earth Station Antenna Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/andrew/4-9-meter-earth-station-antenna/4-9-meter-earth-station-antenna_operating-and-maintenance_2942518010.webp)
Overview
Foundation
Preparation
10
Installation Procedures
This section provides installation procedures for the 4.9-Meter Andrew Earth Station
Antenna. The installation procedures include instructions on the following antenna com-
ponents:
•
Reflector/Enclosure
•
Reflector-to-Mount Assembly
•
Mount
•
Subreflector
Before beginning the installation process on the ground mount assembly, ensure that
the foundation has been prepared. Foundation specifications are provided by Andrew
and may be used as a reference by civil engineering personnel when preparing the
foundation for local soil conditions. These specifications are available before the ship-
ment arrives by contacting the Customer Service Center or your Account Manager.
•
Foundation should be dimensioned as detailed in Figures 1a and 1b.
•
Sweep foundation clear of any dirt or debris.
•
To ensure smooth surface for mount, scrape foundation pad.
•
Studs should extend 6 in. above the surface and are 1.25 in. in diameter
•
Apply stick wax to stud threads to ease later connections.
Installation Procedures
Figure 1a