Reflector
Unpacking
Step 1
Step 2
43
Installation Procedures
The ground mount assembly is now completed with the necessary operational essen-
tials. All ground mount options (such as motors) have separate instructional bulletins
located in the parts kit that contains the option.
The next step in the installation process is the reflector assembly. Proceed to the
instructions on assembling the reflector.
The precision-spun aluminum reflector assembly enables ease of installation and
ensures accurate surface contour providing exceptional operating characteristics in the
C-/Ku- frequency band.
NOTE:
The instructions below are provided for the split-reflector style 3.7-Meter Earth
Station Antenna. If you are installing the full reflector style, skip this section and proceed
to Step 7.
Upon receiving your 3.7-Meter Earth Station Antenna, notice that it is delivered in a
wooden crate and covered with a white nylon sheath. The protective crate covering
shields the product from being damaged during the shipment process.
While unpacking the shipment, ensure that the correct parts are included by checking
them against the packing list. The following steps provide the procedure for unpacking
the crate.
The crate arrives on site covered in a white sheath (domestic pack) or wood (export
pack). See Figure 3-30a and Figure 3-30b.
Remove the protective covering from crate.
Pry the top crate panel off with a pry bar.
Figure 3-30a: Domestic Pack