Installation
Sequence
Checklist
Site Preparation
Ground Mount
Assembly
For MPK Types
Only
The 3.7-Meter Earth Station Antenna requires the installation team to perform the
assembly in the sequence presented below. Moreover, this sequence should be
reviewed to ensure a smooth installation. Use the following checklist to verify and/or
determine the installation sequence.
Refer to Foundation Section for guidance in preparing location and installation of the
3.7-Meter Earth Station Antenna foundation.
Unpack ground mount assembly
Attach ground mount assembly to foundation
Organize ground mount hardware
Wax galvanized hardware in hardware kit
Tighten ground mount hardware to foundation
Attach azimuth strut weldment to ground mount assembly
Assemble azimuth strut
Mount azimuth strut to ground mount assembly
Bolt elevation strut brackets to elevation strut
Mount elevation strut to ground mount assembly
Assemble manual actuator
Remove manual actuator (after elevation/azimuth adjustment)
10
Getting Started