
40
Operator's Manual – Log Loader and Forestry Trailer
Anderson Group
4.6 Installing the dump box (available for the M-90 and M-115 models)
To install the dump box:
1. Remove the eight posts on the sides of the trailer.
2. Place the front support between the safety barrier and the front crossbar.
3. Place the dump box on the trailer so its rear supports straddle the rear crossbar.
NOTE:
You can use the loader boom and chains to install the dump box on the
trailer.
Содержание M-115
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 18: ......
Страница 42: ......
Страница 48: ......
Страница 56: ......
Страница 57: ... KDUJHXVH j ERLV HW UHPRUTXH IRUHVWLqUH 0 5 0DQXHO GH 3LqFH ...
Страница 58: ...Anderson Group 5125 de la Plaisance Chesterville Québec G0P 1J0 Email VHUYLFH JUSDQGHUVRQ FRP 98 e1e5 1 5 9 ...
Страница 74: ...Anderson Group 5125 de la Plaisance Chesterville Québec G0P 1J0 Email VHUYLFH JUSDQGHUVRQ FRP 0 7 0 67 ...
Страница 90: ...Anderson Group 5125 de la Plaisance Chesterville Québec G0P 1J0 Email VHUYLFH JUSDQGHUVRQ FRP 5 02548 5 5 ...
Страница 161: ......