18
APPENDIX #2
30’ NAVI-TRAC LT CLEARSPAN
10’
30’
30’
10’
59
60
SINGLE OPPOSING
CABLES ON
OPPOSITE SIDES
OF BOTH END BAYS.
X-CABLED UPRIGHT BAY
ADDED SO THERE ARE
NO MORE THAN 6 OPEN
BAYS BETWEEN UPRIGHT
CABLED BAYS.
CLEARSPANS UP TO 6 OPEN BAYS
CLEARSPANS EXCEEDING 6 OPEN BAYS BETWEEN
UPRIGHT CABLED BAYS.
Caution
:
While standing beams, be sure to
“foot” the baseplate so that the beam does not slide out
from under the workers pushing it up.
After the first bay has been X-cabled, the installation
safety guys can be removed.
Gabled Ends are installed in the same way as the Hip-
Gabled units described above.
As before, be sure to guy out the frame before installing
fabric.
Note:
To meet design loads,
X-Cabled bays (upright
and rafter x-cables) shall be added such that there
are no more than 6 open bays between x-cabled
bays or hip ends.
(see fig. 58)
Additional
X-Cabled Bay
57
58
10’
(MAX)
10’
(MAX)
80’
90’
Maximum 6
open bays (no
x-cables)