COMPLETING THE HIP END 

UPPER FRAME

In the following steps the upper frame of the hip end will be 
completed (see fig.13 to the right).  Following this sequence 
will result in a smooth assembly.

As this upper frame is completed, you should begin to position 
the hip end close to its intended position. 

In addition to the long and short pins used above, the corner 
weldments have a 

thicker short pin

 that is used only for hori-

zontal pinning through the lower end of the hip bar.

Complete the end eave by joining each 
Eave Bar (E-15) to the Eave Weldment 
(EW), as shown, and pin with long pins.

Insert a square arm of a Corner Weldment 
(CW) to each outer end of the Eave Bar (E-
15) as shown and pin with a long pin.

Using the Rafter w/ Hook (RH-30) and the Eave Bars (E-15) 
for leverage, pivot the cross beam to a vertical position, lin-
ing up the Eave Bars with the Corner Weldments at each 
end of the end Eave Bar assembled in the preceding steps.

The free ends of the Eave Bars used to pivot the 
cross beam can now be attached to the Corner 
Weldments and pinned vertically with a long pin.

The free lower end of the Rafter w/ Hook can be 
attached to the Eave Weldment (EW) at the center 
of the end eave.  Secure vertically with a long pin.

Install the upper end of each Hip Bar to the ridge weldment at the top of 
the cross beam.  To do this, 

first align the Hip Bar straight in

 along 

side the Rafter w/ Hook, then swing the lower end of the Hip Bar out-
ward to the Corner Weldments and pin with the short, 

thick

 pin.  

Close-up of the Hip Bar (H-30) connection to the 
Corner Weldment (CW).  Notice the slotted underside 
of the hip bar designed to drop over the top arm of the 
Corner Weldment.

E-15

EW

END EAVE

END EAVE

CW

E-15

(RH-30)

EW

(R-30)

HIP

CORNER

CW

E-15 

(END)

E-15 (SIDE)

CW

E-15 (SIDE)

(RH-30)

(R-30)

CW

E-15 (SIDE)

E-15 (END)

H-30

(R-30)

(H-30)

RW

(RH-30)

INSTALLING HIP BARS (H-30)

PIVOTING THE CROSS BEAM

13

14

15

16

E-15 (END)

17

18

19

20

Содержание Navi-Trac Lite

Страница 1: ...n instructions before the installation or removal of this product Installation Instructions Navi Trac Lite Frame Tent 30 Wide System Non Certified Installation 7701 Highway 41 N Evansville IN 47725 Ph...

Страница 2: ...g Guidelines 7 Frame Assembly Cross Beam 8 Hip End Upper Frame 9 Upright Installation Adding Mid Bays 10 Hip Frame Completion 11 Fabric Installation Fabric Guide Bracket 11 Hip End Panel 12 Mid Panel...

Страница 3: ...el beams intercon nected by ridge bars purlins and eave bars see the Appendix I The hip end gabled end hex end versions of the LT are guyed units that depend on staked ratcheted guy webs at legs and c...

Страница 4: ...N SAFETY GUYS FABRIC PULL ROPES X CABLING NAVLTCS BAY15 U8 NAVLTCS BAY15 U9 NAVLT BAY15 RIDGE BRACE RB NAVLTCS BAY15 U10 U BRACKET END PROFILE WRAPS AROUND BEAM ON BOTH SIDES L BRACKET END PROFILE WRA...

Страница 5: ...E 3580660 1 1 UPRIGHTS U 8 UPRIGHT 8 8004450 8 2 WELDMENTS FITTINGS PLATES BA BASEPLATES ADJUSTABLE 2 HOLED 8004505 8 2 CW CORNER WELDMENTS W PINS 8004525 4 0 RW RIDGE WELDMENTS W PINS 8004545 1 1 EW...

Страница 6: ...se of the section to avoid slippage along the ground 10 When installing gabled end units be sure all beams are stabilized either by safety guys or cross cabling until con nected to a section of the un...

Страница 7: ...E LINE IS EQUAL TO THE UPRIGHT HEIGHT FOR EXAMPLE 8 UPRIGHT 8 STAKE OUT DISTANCE 1 30 Stake through base plate Drive into ground as far as possible 42 Stake driven through stake plate Stake must be dr...

Страница 8: ...t pin provided thru the rafter side to side to secure the connection Slide the top squared ends of each Rafter R 30 onto the Ridge Weldment RW and secure with the short pins provided on the weldment A...

Страница 9: ...Corner Weldments at each end of the end Eave Bar assembled in the preceding steps The free ends of the Eave Bars used to pivot the cross beam can now be attached to the Corner Weldments and pinned ver...

Страница 10: ...y adding parallel middle bays as shown fig 25 Each middle beam is constructed the same as the hip end cross beam except that uprights are attached before standing the beam to vertical Also the con nec...

Страница 11: ...in the tensioning slot of the upright leg as shown to the right see fig 34 35 Using the butterfly set screws attach the Navi Trac Wheeled Panel Guide wheels into the open end of the bracket at the hin...

Страница 12: ...frame fig 38 Insert the leading edge of the kedar between the guide wheels and pull the panel up and over When the leading edge of the kedar reaches the eave weld ment on the opposite side pull the co...

Страница 13: ...the tent to the other so that the snaps hang near the Fabric Guide Brackets Feed the leading edge of each Middle Panel kedar through the gap in the guide wheels on each side of the Middle Panel and sn...

Страница 14: ...HOTO THE TENT WALLS HAVE ALREADY BEEN INSTALLED TO SLOT IN UPRIGHT WEB RATCHET DOUBLE HOOK MID 2 OR HIP MID 1 TENSION STRAP 2 TENSION STRAP 1 PULL RING VELCRO GUY WEB DOUBLE HOOK TENSION STRAPS WEB RA...

Страница 15: ...ITH CHANNELS E 15 EAVE 15 8004410 0 2 RG 15 RIDGE W HOOKS 15 8004415 0 1 R 30 RAFTER 30 WHITE BRACE HOLE 8004440 0 2 EE 10 GABLED END MID EAVE 10 8004475 1 0 EW 10 GABLED END WING EAVE 10 8004460 2 0...

Страница 16: ...it will be easier to install the Gabled End Uprights GU and the Gabled End Rafter Fittings GFL and GFR while that end beam is still on the ground On the 30 Frame the top fitting on the GU must be slid...

Страница 17: ...NCE RIGHT SIDE LEFT SIDE STANDARD LOOP GROMMET LACE WITH WEATHER FLAP TOP CHANNEL A structure with 2 Gabled Ends lacks the initial stability normally provided by the hip end frame during installation...

Страница 18: ...so that the beam does not slide out from under the workers pushing it up After the first bay has been X cabled the installation safety guys can be removed Gabled Ends are installed in the same way as...

Страница 19: ...legs are hinged see parts BH BHG on page 4 so that the beam can be pivoted to vertical after the baseplate has been secured to the ground or to appropriate footings The baseplates have 4 holes for st...

Страница 20: ...VLWH 6WDNLQJ LQIRUPDWLRQ SURYLGHG LQ WKH LQVWDOODWLRQ LQVWUXFWLRQV LV QRW D VXJJHVWLRQ DERXW ZKDW LV QHFHVVDU WR PHHW D VLWH VSHFL F ORDG RU DGGLWLRQDO LPSRUWDQW LQIRUPDWLRQ FRQVXOW 7KH 3URFHGXUDO DQ...

Отзывы: