![Analog Devices Hittite HMC-T2000 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/analog-devices/hittite-hmc-t2000/hittite-hmc-t2000_user-manual_2940263007.webp)
HMC-T2000 User’s Manual HMC119983 Rev 1
5
•
A grounded, three pin AC power receptacle should be used to connect power
to the AC Wall Power supply. It is recommended that the ON/OFF power switch
on the rear panel should be used to interrupt power to the unit. Interrupting power
by pulling out the AC cord may result in injury or unit damage.
•
The detachable AC power cord, and the power switch on the rear panel must
be easily accessible to facilitate removal of power from the unit.
•
Verify the facility AC line voltage is within specifications before applying power
to the unit, or the applied DC power source is within the specifications of the unit. See
paragraph. 5.2.6 to determine the acceptable input AC voltage, and frequency range.
•
The DC power connector has GND pins which connect to the chassis. Both of
these must be connected to GND for safe operation of the unit.
5
Operation and Setup
The SG unit control features and setup are detailed in this section.
5.1
Equipment Setup and Operation
Before the SG unit can be operated, external coaxial cables, equipment and
instrumentation are required to be set-up. The instruction steps listed below must
first be completed:
1.
Use appropriate ESD precautions when connecting cabling, and external equipment to
the HMC-T2000 Signal Generator.
2.
Verify that the rear panel power switch is switched to the “OFF” (labeled O) position.
3.
Connect DC power cable to rear panel (DIN style DC power connector).
4.
Connect the AC power cable to an appropriate 3 prong AC receptacle.
5.
Connect the RF output to the peripheral equipment using a type N adapter.
6.
If desired, connect the USB connectors to the Host PC or equivalent.
7.
If desired, connect the appropriate BNC connectors to external equipment to provide an
external 10 MHz reference.
8.
If desired, connect external equipment to the 10 MHz reference output.
9.
Toggle the rear panel power switch to the “ON” (labeled 1) position.
10. Allow a minimum of 30 minutes warm-up time before using the instrument.
11. Verify the unit is powered on by monitoring the front panel LCD display.
12. Using either the Front Panel Controls or the USB interface, control the operation of the
SG.
Содержание Hittite HMC-T2000
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 19: ...HMC T2000 User s Manual HMC119983 Rev 1 17 The software is being installed Select Continue Anyway...
Страница 20: ...HMC T2000 User s Manual HMC119983 Rev 1 18 Select Finish Select Next...
Страница 22: ...HMC T2000 User s Manual HMC119983 Rev 1 20 This window is displayed to show installation progress Select Close...
Страница 28: ...HMC T2000 User s Manual HMC119983 Rev 1 26 Select OK Select OK Select OK 10 Select Yes to begin calibration...