Product Information
2
6" Color Video Wall Panel
Cleaning the Touch Overlay
You should clean the touch screen overlay often. Always use clean cotton cloths, and a spray bottle
of cleaning solution consisting of 50% isopropyl alcohol and 50% water.
Specifications (Cont.)
Rear Connectors:
AXlink
4-pin bus connector for connection to the AMX Central Controller.
PWR
+12 VDC power supply; power is supplied through the bus or an external PSN power
supply.
RS-232
DB-9 male connector for data transmission or Microsoft
®
mouse control
Video
BNC female connector (NTSC/PAL/SECAM)
Character Support
Unicode
®
character support for far-eastern languages such as Chinese.
Characters for middle-eastern languages such as Arabic are not supported within
the Unicode fonts because they are bi-directional. Buttons with Unicode fonts can
only be created and edited using TPDesign3 and NetLinx Studio. Refer to the
respective manuals for additional information.
Compatibility
Axcess, NetLinx, and Landmark systems (AXlink is the most common control stan-
dard for this system).
Operating Environment
Indoor operation at temperatures between 0
º
C (32
º
F) to 50
º
C (122
º
F) and a
humidity range of 5% to 90% RH (non-condensing).
Installation Kit
• 4-pin AXlink data/power connector
• 2-pin PWR connector
• Drywall clip set (2-drywall clamps and 2- #8 (2" long) screws)
• 4-#4-40 machine screws and threaded inserts
Enclosure
• Metal sub-plate and bezel with black or white matte finish
• Detachable magnetic front panel bezel
Installation Cutout
Cutout Template for the AXD-CV6 is available as drawing number 62-5924-06 and
inserted in the product packaging. This file provides 1:1 cutout dimensions for the
CV6 conduit/wallbox. For replacement of the cutout, contact your AMX sales repre-
sentative.
Optional Accessories
• PSN2.8 Power supply (can be used to power the CV6)
• PSN6.5 Power supply (recommended to power the CV6)
• Optional spacers and bezels for international sales
• BB-CV6 Conduit/wallbox (includes flanges for installation to studs during the
construction phase).
Conduit/Wallbox should only be mounted to a beam
before a drywall is installed (pre-wall).
Содержание AXD-CV6
Страница 16: ...Installation 12 6 Color Video Wall Panel ...
Страница 53: ...Replacing the Battery 49 6 Color Video Wall Panel ...