background image

Suggested Piping Diagrams

PRESSURE

SWITCH

RELIEF VALVE

DRAIN

TO TITAN
PRESSURE 

GAUGE

SUBMERSIBLE PUMP

AIR CAP

Installation

System Connection

Models:

TC-20 through TC-32: 1" NPT

TC-44 through TC-119: 1¼" NPT

 

For PVC System Connection:

1.

  Plumb tank with standard NPT threaded connection or plumb 

tank with glue joint fitting by first cutting hex and NPT fitting off.

2.

  If cut was made, glue a Sch 80 PVC coupling (not included).

Pre Installation

DO NOT LOCATE IN AN AREA WHERE LEAKAGE 

OF THE TANK OR CONNECTIONS COULD CAUSE 

PROPERTY DAMAGE TO THE AREA ADJACENT TO THE APPLIANCE 

OR TO LOWER FLOORS.

Installation Surface:

The surface on which the Titan is installed should be capable of 

supporting its operating weight (including the weight of water). 

The Titan should be installed as close as possible to the pressure 

switch. This will reduce the adverse effects of added friction loss 

and differences in elevation between Titan and/or water supply 

main and switch.

Installation Location:

Adjacent to pump:

 This is the location chosen most often. The 

Titan tank can be used whether pumps are above or below the 

surface. In either case, it protects the pump by reducing surge, 

dampening pressure spikes, offering a point of pressure control, 

and providing minimum run time. This location also permits all 

equipment to be placed in an area that’s both serviceable and 

secure.

At the end of long pipe runs:

 The Titan tank can be positioned 

at the end of a long run of pipe so it can provide rapid 

system response and adequate protection. When this location is 

chosen, the pressure switch should either be relocated with the 

Titan tank or the setting should be adjusted to compensate for 

any line pressure drop.

Tank Prep/Install:

1.

  Remove protective air valve cap.

2.

  Check pre-charge pressure from valve core.

3.

 Release or add air as necessary to set the pre-charge 

pressure 2 psig below the pressure switch pump cut-in 

setting. (Example, 38 psig precharge for a 40/60 pressure.)

4.

  Replace protective air valve cap. 

5.

  Plumb tank per the chosen system diagram.

6.

  Wire in pressure switch.

PRESSURE SWITCH

RELIEF VALVE

DRAIN

AIR CAP

HEX

CONNECTION TO TANK

NPT PLUMBING CONNECTION

Отзывы: