PLEASE READ THE IMPORTANT NOTE BELOW BEFORE INSTALLING THE BATTERIES INTO THE UNIT!
IMPORTANT NOTE:
It is highly recommended that you install the unit and tighten the locking ring
before installing the batteries. Then check that there is no left over water in
the battery contact area as shown by the arrows in the diagram above. If there
is water present use a towel and wipe off all the water before installing the
batteries to avoid any possible damage to the batteries and the unit.
BATTERY CONTACT AREA
PLEASE DO THE FOLLOWING BEFORE INSTALLING THE BATTERIES
1. MAKE SURE CONTACT AREA IS COMPLETELY DRY AFTER INSTALLING
THE LOCKING RING AND BEFORE INSTALLING THE BATTERIES!
2. DRY YOUR HANDS BEFORE HANDLING THE BATTERIES
BATTERIES
WARNING!
PLEASE READ BEFORE INSTALLATION!
1. Read all instructions prior to installing this product.
2. Make sure that water volume of the unit (GPF)
matches the water volume (GPF) on fixture.
3. Make sure you have the proper locking ring for your
®
®
®
fixture. Either for an AMTC /Sloan or Zurn valve body.
4. When installing unit on a poorly draining urinal or
toilet bowl it is highly recommended that the angle
stop on the flushometer be throttled back to the point
where the water drains faster than the water being
flushed to prevent overflow.
ATTENTION!
Pre-Installation Note
3