When the batteries have been properly installed and fastened, either Tower PRO S or Tower PRO M with 
two battery modules, connect them. The connection is made between the electronics module and the 
battery and between both batteries (Master and Slave). 

 

5.8.1

 

Accesses and ports of the battery modules. 

The installation of the Master battery requires 6 connections: 2 for power (positive and negative) and 4 
for communications (trip coil, communication between the Master and Slave and two for communication 
with the electronics module). 

The installation of the Slave battery requires 3 connections: 2 for power (positive and negative) and 1 for 
communications (communication between the Master and Slave). 

Below  there  is  an  explanation  of  the  ports,  indicators  and  buttons  that  are  useful  for  installing  the 
batteries: 

 

The  Master  battery  is  already  properly  connected  to  its  digital  outputs,  so  this 
connector  should  not  be  disconnected  under  any  circumstances.  An  incorrect 
modification of this connection would cause a safety fault in the batteries

’ protection 

system. 

 

 

Operating and 

charge status 

indicators 

Digital 

output 

(CON3) 

RJ50 CO 

port 

(CON2) 

RJ50 WU 

port 

(CON1) 

- Power 

port 

(CON4) 

+ Power 

port 

(CON5) 

On/off 
button 

RJ50 SCO 

port 

(CON6) 

Содержание TOWER PRO M

Страница 1: ...AMPERE TOWER PRO S TOWER PRO M INSTALLER MANUAL VERSION IM_TW_PRO_S_M_V001_EN...

Страница 2: ...RE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 2 AMPERE POWER ENERGY S L Pol gono Industrial Campo An bal Av del Progr s 13 46530 Puzol Valencia SPAIN Tel 34 961 42 44 89 email support ampere energy...

Страница 3: ...h own PV installation 21 3 4 4 Integrated single phase wiring diagram with no PV installation 22 3 4 5 Integrated three phase wiring diagram with PV connection 23 3 4 6 Integrated three phase wiring d...

Страница 4: ...ardware requirements of the PC 54 8 1 2 Software requirements of the PC 54 8 1 3 Considerations 54 8 2 CONFIGURATION FILE 54 8 3 CONFIGURATION OF THE AMPERE DEVICE AND WIRELESS INTERNET CONNECTION 55...

Страница 5: ...by AMPERE POWER ENERGY S L as being trained and qualified to install its products and accredited for such purpose Before installing the Tower Pro S or Tower pro M the installer must read and understan...

Страница 6: ...mbols Indicates an instruction which if not followed may cause death or injury Indicates a useful tip for using the AMPERE Tower Pro Warning about general hazards or important information Warning abou...

Страница 7: ...the casing does not mean an absence of voltage inside There is a danger of electric shock even if the system is disconnected from the mains as the batteries may still be charged Only qualified staff m...

Страница 8: ...2 3 Potential hazards for the equipment Cooling The equipment requires ventilation to expel the interior heat Avoid obstructing the air inlets and outlets Connections Ensure that all connections have...

Страница 9: ...own inverter On the other hand in the case of existing photovoltaic installations retrofitting with inverters the system detects them and is able to work together with them without losing any function...

Страница 10: ...power is available or there is a charge in the battery 3 2 List of components Main components of the AMPERE Tower Pro COMPONENT IMAGE Cabinet with electronic module 50 kg 4 After a power outage the t...

Страница 11: ...TOWER PRO M IM_TW_PRO_S_M_v001_EN 11 2 x Battery module 44 kg battery 0 x Battery module in Tower M PRO 0 3 PV and Tower M PRO 0 5 PV 1 x Battery module in Tower M PRO 6 3 PV and Tower M PRO 6 5 PV F...

Страница 12: ...MPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 12 Internal cables included and pre installed in the AMPERE Tower Pro CABLE REFERENCE IMAGE Trip coil signal cable Molex 2 way connector cable MCOIL...

Страница 13: ..._S_M_v001_EN 13 EMS Master Battery communication cable Connector cable RJ45 RJ505 BWU above and BCO below 5 The RJ50 connector will be shipped later when a battery module is purchased for the AMPERE T...

Страница 14: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 14 Inverter Battery power cables AWG6 cable MBAT MBAT SBAT SBAT...

Страница 15: ...is the communication cable between the Master and Slave batteries The cable SCO will be sent back in the case of the AMPERE Tower Pro M when an additional battery module is purchased for Tower Pro M 6...

Страница 16: ...e washers DIN 9021 M5 Fixing of Battery In AMPERE Tower PRO M the units marked with the symbol will be halved in Tower PRO M 6 3 PV and Tower PRO M 6 5 PV as there will be one less battery module In c...

Страница 17: ...ce 120 Ohms One end is installed in the energy meter see section 11 and the other end is installed with an RJ45 connector that is supplied with the system Mains connection 3 cables L N and Earth each...

Страница 18: ...agrams The internal wiring diagram is detailed below with details of the different types of installations for each photovoltaic system and number of phases 3 4 1 Internal wiring diagram In AMPERE Towe...

Страница 19: ...oltaic installation and AC current mains supply and backup It also manages the flow of energy between the different components EMS Energy Management System It controls the system s charging and discha...

Страница 20: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 20 3 4 2 Integrated single phase wiring diagram with PV connection...

Страница 21: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 21 3 4 3 Integrated single phase wiring diagram with own PV installation...

Страница 22: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 22 3 4 4 Integrated single phase wiring diagram with no PV installation...

Страница 23: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 23 3 4 5 Integrated three phase wiring diagram with PV connection...

Страница 24: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 24 3 4 6 Integrated three phase wiring diagram with own PV installation...

Страница 25: ...AMPERE TOWER PRO S TOWER PRO M IM_TW_PRO_S_M_v001_EN 25 3 4 7 Integrated three phase wiring diagram with no PV installation...

Страница 26: ...city recommended for the Backup output IMPORTANT NOTE The maximum available power on the backup output of an Ampere product is 3kW as maximum when the integrated inverter is the 3kW version The Tower...

Страница 27: ...6kW MPPT Voltage range PV version 125 480 V Maximum input voltage PV version 550 V Maximum Current PV version 12 12A Number of strings PV version 1 Number of MPPT PV version 2 Nominal AC Voltage 230...

Страница 28: ...rid inverter Nominal power 3kW 6kW 3kW 6kW MPPT Voltage range PV version 125 480 V Maximum input voltage PV version 550 V Maximum Current PV version 12 12A Number of strings PV version 1 Number of MPP...

Страница 29: ...48 mm and once installed it can be concealed with the cover that is supplied Ref Description 1 PV switch 2 Access to the battery circuit breaker 3 PV cable bushing 4 Energy Meter port 5 Ethernet port...

Страница 30: ...8 Labelling The image below is the label with all of the Tower PRO s characteristics Model capacity rated power and with without PV input Mains supply parameters Auxiliary supply parameters Capacity i...

Страница 31: ...to place the unit near to the switchboard for ease of installation Running the cables through existing conduits may also present certain difficulties another reason for placing the system as close as...

Страница 32: ...from overturning The point load that has to be supported by the wall is 30 kg with a minimum distance of 40 cm between points Different wall plugs may be used depending on the wall material The instal...

Страница 33: ...not disconnect any cable that is already connected and no cable should be left disconnected THE BATTERY SWITCH SHOULD BE IN THE OFF POSITION THROUGHOUT THE INSTALLATION TWO INSTALLERS ARE NECESSARY FO...

Страница 34: ...se of the Tower PROM 0 3 PV and Tower PRO 0 5 PV the wall mounting with the main casing and the corresponding battery modules Suitable safety equipment should be used to transport and handle the packa...

Страница 35: ...PRO S On AMPERE Tower PRO M it will be shipped if an additional battery module is installed Tower PRO M 6 3 PV or Tower PRO 6 5 PV or when both battery modules are purchased Tower PRO M 0 3 PV or Tow...

Страница 36: ...que 18Nm 5 5 Connectionto the AC mains On the DIN rail located on the upper right there are 6 connection terminals Earth Phase and Neutral in that order from left to right of the mains supply GRID and...

Страница 37: ...the main supply with the particularity that the earth cable instead of connecting to the terminals is connected to the earth connection point on the right to a few millimetres from the top of the ter...

Страница 38: ...ovoltaic plant s connections and connect them accordingly to the AMPERE Tower PRO Prior to connection the photovoltaic installation must be properly connected with the positive and negative cables rou...

Страница 39: ...tovoltaic installation s solar connectors to the AMPERE Tower PRO with the correct polarity The cables leading from the system s input to the solar connectors go inside the conduits on the left To rem...

Страница 40: ...he Master battery module is placed on the upper bracket and the Slave battery module in the case of the Tower PRO is placed on the lower bracket IMPORTANT NOTE The Master battery module has a sticker...

Страница 41: ...5Nm 3 For the AMPERE Tower PRO S and the AMPERE Tower PRO M Tower PRO M 6 3 PV and Tower PRO 6 5 PV place the Master battery on the upper bracket with the handles to the left and the power connector...

Страница 42: ...wo for communication with the electronics module The installation of the Slave battery requires 3 connections 2 for power positive and negative and 1 for communications communication between the Maste...

Страница 43: ...s that connect to the batteries coming out of it These cables are as follows CABLE REFERENCE Master positive battery power cable MBAT Master negative battery power cable MBAT Slave positive battery po...

Страница 44: ...auxiliary elements and its reference is SCO see 3 2 The connections should be made as follows REF CABLE PORT Master Battery CON1 BWU RJ50 WU port CON2 BCO RJ50 CO port CON3 MCOIL Digital output Free...

Страница 45: ...trip coil signal cable is connected to the battery s CON3 free hanging connector The communications cable between the Master and Slave batteries is connected to the Master s CON6 port and the Slave s...

Страница 46: ...Meter Model Connection Installation Carlo Gavazzi EM111 1 Phase Energy Meter Direct Single phase 6 mm2 45 A Carlo Gavazzi ET112 1 Phase Energy Meter Direct Single phase 25 mm2 100 A Carlo Gavazzi EM2...

Страница 47: ...ve automatic firmware updates improved performance fixing bugs etc View data in the App and in the WEB platform Remote maintenance This connection can be made via an Ethernet cable or wirelessly If co...

Страница 48: ...MAY HAVE LIVE ACCESSIBLE PARTS WITH A DC VOLTAGE up to 58V OR AC VOLTAGE 230 VAC FAILING TO FOLLOW THE INSTRUCTIONS CONTAINED IN THIS MANUAL MAY LEAD TO A RISK OF ELECTRIC SHOCK An initial turn on tes...

Страница 49: ...N position as indicated in section 0 If the LEDs do not indicate that it is working properly there is an error In this event you should check the connection between the battery and the EMS and between...

Страница 50: ...ks This cover is attached to the wall bracket by means of 2 safety screws one at the top and one at the bottom 2 Place the AC thermal magnetic circuit breaker on the property s switchboard in the OFF...

Страница 51: ...r central part Tightening torque 5Nm 6 5 Fitting the filter The filter consists of a nylon mesh in a metal frame This filter should be placed between the wall mounting and the filter cover and then sc...

Страница 52: ...e AMPERE Tower PRO to avoid excessive discharging of the batteries with the residual standby consumption The complete shutdown process is described below 1 Turn off the Standby button on the panel at...

Страница 53: ...tes tripping the battery s circuit breaker If you need to manually switch off the batteries follow these steps 6 Remove the cover so that you can access the batteries 7 Normal shutdown turn off the ba...

Страница 54: ...PRO to have direct line of sight with the access point router and for there to be no metal boxes between the router and the AMPERE Tower PRO e g microwave ovens or a lift to avoid signal attenuation...

Страница 55: ...ERE device s USB port Wait for a few seconds and the AMPERE Tower PRO will automatically read the configuration file The LED light will turn off indicating that the system is being restarted with the...

Страница 56: ...enance is performed without removing the casing This maintenance should be performed every 6 12 months depending on the environment in which it is installed The steps to follow for maintenance are 1 R...

Страница 57: ...ed Make sure that the cables are not in contact with any live parts 9 3 2 Cooling system You must ensure that the air inlet and outlet are not being blocked as this may cause the system to overheat Th...

Страница 58: ...rgy provided that all installation and servicing instructions described in this manual are strictly followed Failing to follow the installation procedures will automatically void the warranty and seri...

Страница 59: ...th Carlo Gavazzi ET112 To carry out the power wiring the line coming from the electrical network is connected to terminal 1 downstream of the general protections differential and magneto thermal of th...

Страница 60: ...5 To avoid errors due to signal reflections or the line coupling it is advisable to connect the 120 ohm 0 5 W 5 internal termination resistor between the B and A lines This resistor is built into the...

Страница 61: ...r the line coupling it is advisable to connect the 120 ohm 0 5 W 5 internal termination resistor between the B and A lines This resistor is built into the model and connected by joining terminal 3 to...

Страница 62: ...to the METER input at the bottom of the device and to the energy meter at the other end using prongs and following the connections in the upper right diagram and in the table below 8 In environments w...

Страница 63: ...he B and A lines This resistor is built into the model and connected by joining terminal 8 to terminal 5 Line termination is necessary even for point to point connections and or short distances The sc...

Страница 64: ...hree Phase Option with Carlo Gavazzi EM271 The device has a sticker with the text 3F to demonstrate that it is configured with the three phase option To wire the power cables the 3 lines and the neutr...

Страница 65: ...pole connector at one end with the pinout shown in the image to connect it to the METER input and to the energy meter at the other end using tips and following the connections in the diagram and in t...

Страница 66: ...creen of the MODBUS RS485 communication cable should only be connected at the end that is connected to the Ampere Tower PRO system using the connector supplied The screen of the cable must never be co...

Страница 67: ...e that measures PV generation is connected downstream from the external PV inverter The communication channel is parallel connected daisy chain with the communication channel of the main Energy Meter...

Страница 68: ...e energy meter When measuring one phase of the installation plus external PV connect current transformer 2 of the hub 1 with the external PV inverter When measuring three phases of the installation pl...