FLEECEBACK & INSULATION MOBILE ADHESIVE DISPENSING CART
Drum Installation Overview
The cart then stands up and you
roll the B Side Barrels into place.
Tie down the straps and tighten
them to keep them in place.
Then to make a connection attach
the hose and move the ears out of
the way and push the male down
into it and clamp it.
Load the A Side barrel on the same
way.
Tighten the strap so that the
barrel is secure.
Pull down the A Side Hose into
place, tighten and clamp it makign
sure to mvoe the ears back.
Once the barrels are in place find
be sure to tighten the Y Strainer
Fittings BEFORE use.
Next fInd a healping hand.
We recommend a buddy system
for any lifting, especially for drums
and carts.
Just tilt the cart down to the
ground.
Then you are ready to go.
Squirt the provided ISO oil 1 time in
the pump in the AM in BOTH ends
of the the reactor.
800.620.7928
PAGE 21
WWW.PATRIOTJR.COM
Содержание P-55
Страница 1: ......