Installation overview
Section
Section
Preparing the wall / ceiling
and fixing the product
Alignment and plastering preparation
in retrofit applications
Cavity
installation with fixing
blocks
Typically a new build
or full refurbishment
Start at page 05
Patch plastered
For walls/ceilings
that have already
been plastered
Page 13
Feathered skim
For walls/ceilings
that have already
been plastered
Page 14
Full wet skim
For walls/ceilings
that have already been
plaster finished
Page 15
Drywall
patch plastered
For new drywall
walls/ceilings that
will be taped
and jointed
Page 16
Drywall
feathered skim
For new drywall
walls/ceilings that
will be taped
and jointed
Page 17
Solid structure
installation
with backbox
New builds or full refurbs
Start at page 10
Cavity installation
with backbox
For new builds or full refurbishment
where sound transmission
needs to be reduced
Start at page 08
A
B
Section
Testing
page 18
C
Section
Finishing
page 19
D
04
A1
B1
B4
A2
B2
B5
A3
B3