1. Be sure to run the generating set at rated speed, otherwise capacitor will produce
the forced excitation. If the running is for a long time under such condition.
capacitor will be burned out,
2. After switching on the air switch, observe the voltmeter on the panel of the control
cabinet, the voltmeter should point to 120V
+
5%(60Hz) for single-phase gener
ating set; 120V/240V
+
5%(60Hz) for single-phase generating set, then the loading
can be carried out.
3. When the double voltage generating set changes over the voltage, the air sw.~,l
should be set at "OFF" position Otherwise the generating set and electric devices
will be burned out and damaged.
4. Connect the equipment to the generating set in order Forthematterofthemotor
load, firsPy the heavy-duty motor should be connected, then the light-duty motors
If the operation is false, the generating set will lag or stop suddenly It is neces-
sary to unload the generating set immediately and turn offthe main switch and do
checks.
6.1 AC application
If overloading of the circuit trips the AC circuit protector, reduce the electrical
load on the circuit, and wait a few minutes before resuming operation.
!
NOTE
11
6.2 DC application
1. DC terminals are only for charging 12V battery,
2 Set the air switch at "OFF" position while charging. On the 12V output terminals,
a charge switch can be connected so the switch can be used for on-and-off
purpose
3. Loncerning the automatic type battery with the leads, be sure to disconnect the
negative leads of the battery while charging.