![amiad EBS-10000 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/amiad/ebs-10000/ebs-10000_installation-operation-and-maintenance-instructions_2932261011.webp)
EBS 10000 IL 910101-000109 / 09.17
Page 11 of 24
the cable. (It is recommended that this installation meets or exceeds local or national electrical codes, this is a "high" voltage
connection).
5.
Control wiring:
The connection between the control junction box and the control board should be by 6 x 1.5 mm 2 (16 AWG) wire in flex-
conduct. The numbers on the terminals in the board and in the junction box are identical.
COMMISSIONING, START-UP AND FIRST OPERATION
1.
Before starting-up the filter read the safety instruction as appear at chapter 2 of this document and pay special attention to
the commissioning safety instructions.
2.
Inspect the filter’s installation and make sure that it is installed in accordance with the official installation drawings.
3.
Verify (by authorized electrician only) that the electric wiring is correct and complies with the enclosed drawings. Make sure
that the electrical start-up operation is done by an authorized electrician only.
4.
Switch the control & 24V circuit breakers and the motor protector to ON. The motor will start operating.
The suction scanner shaft should turn clockwise and move downward to the filter housing until it reaches the lower limit
switch. If the motor rotates in the opposite direction, disconnect the electricity immediately and change the direction of the
motor rotation by changing between two phases.
The motor must stop when the limit switch plate reaches the lower limit switch and causes it to operate.
5.
Operate a "dry" flushing cycle by pressing on the "TEST" push button. Make sure all flushing stages occur as described in the
filter description chapter of this manual.
6.
Open the inlet valve to the filter, while the outlet valve remains closed or with an open by-pass valve (This will keep the flow
in the filter at a minimum), and operate a flushing cycle.
Make sure the exhaust valve opens and all stages of the flushing cycle are carried out. Attend to leakage, if any.
7.
Gradually open the outlet valve and/or close the by-pass valve. Operate the filter at the designed hydraulic conditions.
8.
Set the timer for 6-8 hours.
9.
Check and re-tighten all bolts after the first week of operation.
Содержание EBS-10000
Страница 8: ...EBS 10000 IL 910101 000109 09 17 Page 8 of 24 DIMENSIONAL DRAWING ...
Страница 20: ...EBS 10000 IL 910101 000109 09 17 Page 20 of 24 PARTS DRAWING Section 1 ...
Страница 21: ...EBS 10000 IL 910101 000109 09 17 Page 21 of 24 PARTS DRAWING Section 2 ...
Страница 22: ...EBS 10000 IL 910101 000109 09 17 Page 22 of 24 PARTS DRAWING Section 3 ...