30
Installation
High-Resolution Four Quadrant Supply
d. Connect the coaxial cable from the
352*5$0287
connector on
the back of the Model 420 to the
92/7$*(352*5$00,1*
,1387
connector (7) on the front panel of the power supply. Note
the cable configuration as shown in the diagram.
e. Install an instrumentation cable between the magnet support
stand top plate connector (8) and the magnet station connector J7A
or J7B.
f.
Install an instrumentation cable between the LHe/Temp connectors
J8A and/or J8B on the rear of the Model 420 and the Model 13x
Liquid Helium Level Instrument and/or temperature instrument
(9).
g. Set the Kepco power supply
02'(
to voltage control (to the left),
and set both manual control switches to the
2))
position.
Содержание 420
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 12: ...x Rev 7 List of Tables ...
Страница 18: ...xvi Rev 7 Foreword Safety Summary ...
Страница 22: ...4 Rev 7 Introduction Front Panel Layout ...
Страница 24: ...6 Rev 7 Introduction Rear Panel Layout ...
Страница 30: ...12 Rev 7 Introduction Operating Characteristics ...
Страница 54: ...36 Rev 7 Installation Power Up Procedure ...
Страница 82: ...64 Rev 7 Operation Summary of Operational Limits ...
Страница 132: ...114 Rev 7 Appendix RS 232 422 Connector ...