AMI Analyzer Manual
Installation Procedure
5
Installation Procedure
Figure 1. Back panel of 2001LC analyzer
Don’t open the T-2 or T-4 Oxygen Sensor bag until step 20 of this procedure!!!
1.
Mount analyzer at a convenient eye level.
2.
Confirm sample pressure is less than the analyzer specification (100psig). If it is higher,
use a suitable regulator which must have a stainless steel diaphragm.
3.
Deal with any potential condensation or liquid contamination issues.
4.
Connect the sample line to the sample inlet port with ¼” ss tubing.
5.
Pressurize the sample line to line pressure (between 1psig and 20psig).
6.
Leak check every fitting and weld from the analyzer inlet to the sample tap.
7.
Connect vent line to outside or a suitable purge system.
8.
Connect power, relay contacts, and analog output. If using conduit, run the power and
alarms in one conduit, and the analog output in the other.
9.
Turn on the analyzer.
10.
Adjust the sample flow to approximately 1 SCFH with the Flow control valve.