UltraMig 175
- 8 -
3.4 Gas connections
A. Open the cylinder valve slightly to remove any
impurities and close it immediately.
B. Install the pressure regulator and flow rate meter.
C. Connect the supplied gas hose from the machine to
the regulator.
D. Open the gas cylinder.
4. Operating instructions
A. Connect the unit to a 220 Volt 15 amp outlet.
B. Turn the main switch on the control panel to the on
( “
I”
) position.
C. Select either the
“SYNERGIC”
or
“MANUAL”
option.
Loading the wire drive:
- Unscrew the tension bolt of the upper wheel and
remove the roller.
- Feed the wire into the inlet guide tube until it engages
in the groove of the drive roller and feeds into the gun
liner on the right side of the roller.
- Re-install the upper roller and the tension bolt.
NOTE: Make sure that the tension is not set too tight
and that the wire will run freely.
- Turn the control knob on the torch to the maximum
and feed the wire through the cable by pulling the
trigger with the torch cable extended.
- While the wire is feeding, adjust the gas flow rate
(trigger pulled).
STEEL: 75/15 AR/CO
2
10 – 16L/mn ALUMINIUM: 100% Argon 14 – 20L/mn
Содержание UltraMig 175
Страница 16: ...UltraMig 175 16 Exploded views UltraMig 175 ...
Страница 17: ...UltraMig 175 17 ...
Страница 19: ...UltraMig 175 19 Exploded view Torch MB14 ...