21
P.
Adjust the arm locks
1. After installing the arms
(See Fig.34)
.
2. Lowing the
carriages down to the lowest position, then use the
8
#
ratchet spanner to
loose the socket bolt
(See Fig. 35).
3. Adjust the moon gear as arrow direction
(See Fig. 36).
4
.
Adjust the moon gear and arm lock to make it to be meshed, then tighten bolts of
arm lock
(See Fig. 37).
Fig. 34
Use the
17
#
ratchet spanner
to loose the nut, then use
the
8
#
ratchet spanner to
loose the socket bolt
Adjust the moon gear as
arrow direction to let
them mesh
Snap ring
Fig. 33
floor cover
Содержание A245LX
Страница 1: ...TWO POST LIFT Model A245LX...
Страница 4: ...2 Arm Swings View For Model A245LX Fig 2...
Страница 10: ...8 F Assembly oil hose assy See Fig 15 Fig 14...
Страница 11: ...9 2 Push the carriages to the bottom of the columns See Fig 16 Fig 15 77 80 77A 77 75A 76 77 77 75...
Страница 25: ...23 Model A245LX Cylinders Fig 38 Car in...
Страница 26: ...24 Control Box SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 39 Fig 40...
Страница 39: ...37 Manual Part NO 72222701 Revision date 04 2013 72226604 10 2015...