- 2 -
II. INSTALLATION REQUIREMEN
A
TOOLS REQUIRED
Rotary Hammer Drill (
Φ3/4
)
Carpenter’s Ink Marker
Hammer
Screw Sets
Level Bar
Tape Measure (
295-1/4”
)
English Spanner (12")
Pliers
Wrench Set
:
(10
#
,12
#
,13
#
,14
#
,17
#
,19
#
,24
#
,30
#
)
Lock Wrench
Ratchet Spanner With Socket (28
#
)
Socket Head Wrench
(3
#
, 5
#
, 6
#
)
Fig. 2
Содержание PRO-40
Страница 1: ...FOUR POST LIFT Model PRO 40 PRO 40E Original...
Страница 8: ...6 8 Check the Parts bag according to the parts bag list See Fig 11 Parts bag 1 Parts bag 2 Fig 11...
Страница 25: ...23 IV EXPLODED VIEW 1 8 18 44 28 32 34 50 51 52 53 45 Fig 48 4 2 3 59 10A 10B 10 10A...
Страница 30: ...28 4 3 Power Unit 071107 Exploded View Fig 51 220V 60Hz Single Phase Manual Power Unit Exploded View...