- 11 -
H. Install power side platform.
1. Put the power-side platform upon the cross beams by fork lift or manual, offset the cross
beams to the outside till the pulleys of both platforms can set up into the cross beam
(See
Fig.19)
, Install the power side platform and screw up the bolts
(See Fig.20)
F
Install the power side platform with M30*60
hex bolt and screw up the bolts
Fig.20
Power-side Platform
B
Assembly of 2 pulleys
A View
Fig.19
Assembly of 4 pulleys
B View
Fig.19
Offset the cross beam lean
outward when putting the power
side platform on the cross Offset
the crossbeam and column
A
Содержание PRO-40
Страница 1: ...FOUR POST LIFT Model PRO 40 PRO 40E Original...
Страница 8: ...6 8 Check the Parts bag according to the parts bag list See Fig 11 Parts bag 1 Parts bag 2 Fig 11...
Страница 25: ...23 IV EXPLODED VIEW 1 8 18 44 28 32 34 50 51 52 53 45 Fig 48 4 2 3 59 10A 10B 10 10A...
Страница 30: ...28 4 3 Power Unit 071107 Exploded View Fig 51 220V 60Hz Single Phase Manual Power Unit Exploded View...