- 14 -
2. The cable pass through the cross beam to top plate of columns and be screwed with cable
nuts
(See Fig. 24, Fig.25),
then install cable limit pin
(See Fig.26)
7
Cable pass through between the
big pulley and tension pulley
D View
Fig.24
Cable pass through top plate and
be screwed with cable nuts.
E View
Fig.25
After installation
Install cable limit pin
48
47
Cable
Pulley
Limit
Pin
D
E
F
F View
Fig. 26