12
2
.
Select the width of the foundation according to step E (
Fig.14
) and select
the width of the foundation size 145-3/8” to install the cable.(
Fig.21&Fig22
)
2.1. Cable go through from bottom to the top, tighten the two cable nuts when it pass
through the opening of the carriage. (Fig.21)
Fig. 21
Cable go through from
the inside two cable
connecting block holes
of the carriage
.
66
Cable connecting block
Nuts be locked
each other
Cable go through
direction
Cable go through direction