Ametek SPECTRO MIDEX MID04 Скачать руководство пользователя страница 3

 

 

 

 

 

 

 

 

SPECTRO MIDEX — 31.08.2016  

— 3

 

 

Table of Contents 

1

 

Description of instrument .................................................................................... 4

 

1.1

 

Description .......................................................................................................................... 4

 

1.2

 

Function .............................................................................................................................. 4

 

1.3

 

Overview ............................................................................................................................. 5

 

2

 

Safety .................................................................................................................. 7

 

2.1

 

Symbols used ..................................................................................................................... 7

 

2.2

 

User information .................................................................................................................. 8

 

2.3

 

Intended use ....................................................................................................................... 9

 

2.4

 

Prohibited operating conditions .......................................................................................... 9

 

2.5

 

Residual risks ...................................................................................................................... 9

 

2.6

 

Radiation protection advice .............................................................................................. 10

 

3

 

Technical data................................................................................................... 11

 

4

 

Transportation/Setting-up ................................................................................. 12

 

4.1

 

Storage ............................................................................................................................. 13

 

4.2

 

Gas supply (optional) ........................................................................................................  13

 

4.3

 

Uninterruptible power supply – UPS ................................................................................. 14

 

5

 

Operation .......................................................................................................... 16

 

5.1

 

Overview of controls ......................................................................................................... 16

 

5.2

 

Displays ............................................................................................................................ 17

 

5.3

 

Switching on the instrument ..............................................................................................  18

 

5.4

 

Switching off the instrument ..............................................................................................  20

 

5.5

 

Standby mode ................................................................................................................... 21

 

5.6

 

Carrying out the measurement ......................................................................................... 21

 

6

 

Maintenance by the operator ............................................................................ 25

 

6.1

 

Operator maintenance plan .............................................................................................. 25

 

6.2

 

Energy channel recalibration (MCA) ................................................................................. 26

 

6.3

 

Global recalibration ........................................................................................................... 27

 

7

 

Troubleshooting ................................................................................................ 28

 

8

 

Spare parts and consumables .......................................................................... 31

 

9

 

De-commissioning ............................................................................................ 31

 

10

 

Manufacturer address ....................................................................................... 31

 

11

 

EC Declaration of Conformity ........................................................................... 32

 

 

 
 

 

Содержание SPECTRO MIDEX MID04

Страница 1: ...gt werden M glicherweise wurde die Datei verschoben umbenannt oder gel scht Stellen Sie sicher dass die Verkn pfung auf die korrekte Datei und den korrekten Speicherort zeigt SPECTRO MIDEX XRF Spectro...

Страница 2: ......

Страница 3: ...4 1 Storage 13 4 2 Gas supply optional 13 4 3 Uninterruptible power supply UPS 14 5 Operation 16 5 1 Overview of controls 16 5 2 Displays 17 5 3 Switching on the instrument 18 5 4 Switching off the in...

Страница 4: ...mple causing them to emit radiation This radiation is measured by a semiconductor detector The instrument comes with a preset method of analysis installed Data are already stored in the instrument s m...

Страница 5: ...configurations Your instrument is equipped with various optional features according to the specific application Measurement distance feature Distance of 2 mm optional helium gas flushing Distance of 2...

Страница 6: ...r side 2 Instrument a ON OFF switch 3 Sample chamber with scissor lift table b Fuse 4 Sample chamber flap c Power supply connection point 5 X ray emitter ON OFF indicator d Gas inlet connection point...

Страница 7: ...or on the instrument If required additional important information is available in connection with these symbols Caution Risk of injury Danger Risk of electric shock Caution Laser beam Caution Danger o...

Страница 8: ...epair activity The checking procedure is carried out in accordance with DGUV V3 or an equivalent national regulation Comply with the maintenance schedule specified by the manufacturer and record all m...

Страница 9: ...eter produces electric voltages of up to 48 kV Shut down the instrument immediately if damaged Caution Danger of poisoning The ray exit window of the X ray tube and the detector window contain berylli...

Страница 10: ...n class II Your eyes will suffer damage if you look at this laser pointer for an extended period of time Therefore never look directly at the laser pointer Note If the instrument is in its normal oper...

Страница 11: ...umption 200 W without PC Spectrometer stand by mode power 70 W Fuse rating 16 A slow blow X ray tube Maximum power 40 W Maximum voltage 48 kV Instrument Temperature range 5 C 30 C 41 86 F Specificatio...

Страница 12: ...tall the instrument so that it cannot heat up on one side only Observe the following information regarding the instrument s installation transport Always keep the instrument upright when transporting...

Страница 13: ...C 36 F 104 F 4 2 Gas supply optional The optional gas flush is performed using helium A suitable pressure reducer is required for the gas supply Output pressure 2 3 bar 29 44 psi Gas is supplied via P...

Страница 14: ...the instrument is connected to the UPS Connecting a laser printer to the UPS may destroy the UPS Never connect a laser printer to the UPS If the instrument is equipped with the vacuum option this UPS...

Страница 15: ...changing or reconnecting the UPS proceed as follows 1 Connect all components with the UPS spectrometer PC monitor etc 2 Connect the UPS with the power supply 3 Switch on the UPS 4 Switch on the compo...

Страница 16: ...ment Function 1 Height adjustment wheel For height adjustment of the scissor lift table applies only to configuration with scissor lift table 2 Key switch with removable key Horizontal position ON set...

Страница 17: ...eration SPECTRO MIDEX 31 08 2016 17 5 2 Displays Fig 4 No Display Function 1 X ray radiation X ray radiation indicator Center lit green when instrument is on Lit yellow when X ray tube is in operation...

Страница 18: ...hour Start measuring only after this period Otherwise the service life of the X ray tube will be reduced significantly If the spectrometer is operated inside an air conditioned room a constant ambien...

Страница 19: ...ck on the green Launch Communication Server button 9 Wait until the initialization procedure for the instrument has been carried out and then click on Enter HV Standby to switch the device to standby...

Страница 20: ...the instrument software program A window opens 2 Click on Shutdown The connection between the PC and the instrument is broken 3 Confirm the security query and also confirm the shutoff of the high vol...

Страница 21: ...deactivate the standby mode click on the symbol on the task bar at bottom right This symbol can be used to either activate or deactivate the standby mode Recalibrate the instrument see Chapter 6 2 or...

Страница 22: ...s hard to spot or may be confused with the reflection 2 It is helpful to attach a small adhesive label to the sample when setting the correct height in case the sample is highly reflective Fig 5 To ca...

Страница 23: ...ial 4 to adjust its position until it is at the correct height 1 Fig 7 The setting procedure is indicated on the screen The correct height is reached when the beam of the laser is directed at the cent...

Страница 24: ...he green Start button The measurement is performed automatically 9 Perform further measurements if required The measurement is complete Note Measure a reference sample at regular intervals This will a...

Страница 25: ...the following table are guidelines which should be observed as a minimum requirement The maintenance intervals may vary depending on the use of the instrument To ensure the flawless function of the i...

Страница 26: ...Start button and then select MCA Recalibration The corresponding program window is displayed 2 Place the MCA sample on the sample table 3 Set the correct distance for the sample Use the video camera a...

Страница 27: ...table 2 Set the correct distance for the Flx SP 1 sample Use the video camera and the laser pointer as aids 3 In the software program select the Recalibration menu item beneath the green Start button...

Страница 28: ...ontal position Defective fuse Check the fuse at the rear of the instrument The computer cannot be switched on The power plug is not plugged in properly Plug in the power supply plug properly The monit...

Страница 29: ...r defective tube generator Please contact your service center No image is displayed when the video image is selected in the software program The video cable is not connected or not properly connected...

Страница 30: ...ent position or no sample at all Place a control sample at the measurement position No connection for the helium supply was made when the helium flushing feature was used Make the connection for the h...

Страница 31: ...ent The use of non genuine spare parts will make the CE Declaration of Conformity null and void Excepted are spare parts from manufacturers approved by SPECTRO 9 De commissioning Only organizations or...

Страница 32: ...EC Declaration of Conformity 32 SPECTRO MIDEX 31 08 2016 11 EC Declaration of Conformity...

Отзывы: