Dansensor
®
ISM-3
EN
User Manual
11
4. Operation
ISM-3 is equipped with four keys and a large LED display for indication of the O
2
concentration.
Fig. 3. ISM-3 operation panel
Start up
ISM-3 starts up with a self-test lasting about 10 seconds. After the self-test the heating which
takes 10 minutes begins. If ISM-3 only has been switched off shortly the heating time is
reduced. Minimum heating time is 2 minutes.
The rest of the heating time in minutes is indicated in the display as
H 10
(H for heating). When
the time is counted down to zero the ISM-3 is ready. After 10 minutes ISM-3 has a read-out
difference of max 3% of the read value. I takes the total heating time of 20 minutes until the
ead-out difference is below the specified 1% for the shown value.
If the measuring had been activated when the ISM-3 was switched off, the measuring is
automatically started when ISM-3 is turned on. If an external measuring control has been
chosen, the measuring will start when the measuring control signal is set to ON.
Содержание mocon Dansensor ISM-3
Страница 1: ...P N 200114 I 09 2021 UserManual...
Страница 2: ...This blank page has been inserted to enable double sided printing of the document...
Страница 4: ...2 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 6: ...4 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 10: ...8 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 12: ...10 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 20: ...18 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 28: ...26 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 32: ...30 User Manual EN Dansensor ISM 3 P N 200114 I 09 2021...
Страница 33: ...This blank page has been inserted to enable double sided printing of the document...
Страница 34: ...0 0 VSPQF 4 3 OOFEFWFK 3JOHTUFE FONBSL 5FM JOGP EL NPDPO BNFUFL DPN XXX BNFUFLNPDPO DPN...