TABLE OF CONTENTS T-1
Table of Contents
Page
General Information
.................................................................
P-1
Description of Instrument
......................................................................................................
P-1
Features
..................................................................................................................................
P-1
Instrument Specifications
.......................................................................................................
P-1
Section 1 - Installation
..............................................................
1-1
Unpacking the Instrument
......................................................................................................
1-1
Utility Requirements
..............................................................................................................
1-1
Tools/Equipment Required
....................................................................................................
1-1
Safety Requirements
..............................................................................................................
1-1
Setting up the Instrument
.......................................................................................................
1-2
Connecting Power
............................................................................................................
1-2
Connecting Water Supply Lines
......................................................................................
1-2
Connecting the Drain Lines
.............................................................................................
1-3
Connecting Air to Instrument
..........................................................................................
1-3
Section 2 – Operating Instructions
..........................................
2-1
Front Panel Controls
..............................................................................................................
2-1
Pump Pressure Adjust Regulator
..........................................................................................
2-1
Pump Pressure Gauge
............................................................................................................
2-2
Pressure Relief Valve
.............................................................................................................
2-2
Pump Switch
..........................................................................................................................
2-2
Pressure Valve Left/Right
......................................................................................................
2-2
Cooling Water Switch Left/Right
..........................................................................................
2-2
Pressure Release Valve
..........................................................................................................
2-2
Cylinder Pressure Gauge Left/Right
......................................................................................
2-3
Temperature Controller Left/Right
.......................................................................................
2-3
Heater Switch Left/Right
.......................................................................................................
2-3
Main Power Switch
...............................................................................................................
2-3
Top Transducer Connector
....................................................................................................
2-3
J Thermocouple Connector
....................................................................................................
2-3
Rear Instrument Panel
...........................................................................................................
2-4
Main Power Connection
........................................................................................................
2-4
Serial RS232/RS485 Connections
.........................................................................................
2-4
Preparing the Instrument for a Test
.......................................................................................
2-5
Programming the Temperature Controllers
.....................................................................
2-5
Setting Up the Test Cell
.........................................................................................................
2-5
Preparing the Test Cell
..........................................................................................................
2-6
Running a Test
.......................................................................................................................
2-7
Pressure Control
..............................................................................................................
2-7
Starting the Test
`Ìi`ÊÜÌ ÊÌ iÊ`iÊÛiÀÃÊvÊ
Содержание CHANDLER ENGINEERING Twin UCA 4262
Страница 6: ...P 2 PREFACE This page is intentionally left blank...
Страница 10: ...1 4 SECTION 1 INSTALLATION This page is intentionally left blank...
Страница 20: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Страница 24: ...3 4 SECTION 3 MAINTENANCE AND SERVICING This page is intentionally left blank...
Страница 28: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 32: ......
Страница 33: ...CHANDLER ENGINEERING...
Страница 34: ......
Страница 37: ......
Страница 38: ...CHANDLER ENGINEERING...
Страница 39: ......
Страница 40: ...CHANDLER ENGINEERING...