background image

502-3000 Series Ztron

TM

 Point Level Control

     Operation

20

SECTION 3
OPERATION

This section describes the operating switches of the Ztron
level control. Remove the dome lid and use a small screw-
driver to set the operating controls.

3.1 Setpoint

Control

There is a single operating point adjustment used to control
the level at which the relay operates. See Figure 3-1.

NOTE

This adjustment is a 35-turn potentiometer and
does not have a mechanical stop.  A small click
can be heard when the adjustment has been
turned fully in either direction.

• Turning the setpoint adjustment clockwise raises the level

at which the relay operates.

• Turning the setpoint counterclockwise lowers the level at

which the relay operates.

• The LED (on) indicates that the relay is energized.

Figure 3-1

Ztron Operating Controls and LED

___________________________________

1

High level failsafe when shipped unless specified otherwise when ordered.

1

Содержание 502-3000 Series

Страница 1: ...Service Drexelbrook com Leader in Level Measurement For Assistance Call 1 800 527 6297 Outside North America 1 215 674 1234 Installation and Operating Instructions Series 502 3000 ZtronTM Level Contro...

Страница 2: ...n this manual including but not limited to implied warranties or fitness for a particular purpose Drexelbrook shall not be liable for errors contained herein or for incidental or consequential damages...

Страница 3: ...tronics 502 3000 502 3200 502 3300 502 3400 502 3500 205 Keith Valley Road Horsham PA 19044 US Sales 800 553 9092 24 Hour Service 800 527 6297 International 215 674 1234 Fax 215 674 2731 E mail deinfo...

Страница 4: ...trol optional 21 3 3 Failsafe Selector 21 3 4 Start up 22 SECTION 4 CALIBRATION 23 4 1 Calibration in Conducting Material 23 4 2 Calibration in Insulating Material Horizontal Mount 23 4 3 Calibration...

Страница 5: ...escription The Drexelbrook Ztron Level Control Figure 1 1 includes a 402 3000 series electronic unit and a 700 series sensing element Cote ShieldTM action is designed into all Ztron level controls exc...

Страница 6: ...er 0 120 Vac with relay 2 24 Vdc with relay 3 220 Vac with relay 4 24 Vdc isolated 5 12 Vdc isolated Sensitivity 0 Standard Sensitivity 2 High Sensitivity Electronic Unit Options 0 Standard Electronic...

Страница 7: ...corrosive atmospheres or any possibility of mechanical damage For convenience when adjusting place the electronic unit in a reasonably accessible location Ambient temperature should be between 40o F a...

Страница 8: ...Mounting Recommendations GOOD BEST NOZZLE TOO LONG and COTE SHIELD TOO SHORT WRONG COTE SHIELD MUST EXTEND THROUGH NOZZLE AND WALL BUILD UP GOOD NOZZLE REMOVED FACTORY SUPPLIED EXTENDED COTE SHIELD EX...

Страница 9: ...nduit seals within 18 inches of housing Install per Drexelbrook instructions DREXELBROOK Explosionproof and dust ignition proof 285 1 42 OR 285 1 43 enclosures only for Div 1 Class1 Groups ABCD ClassI...

Страница 10: ...6 502 3000 Series ZtronTM Point Level Control Installation Figure 2 3 Mounting Dimensions Integral Ztron Level Control All dimensions in inches mm...

Страница 11: ...7 502 3000 Series ZtronTM Point Level Control Installation Figure 2 4 Mounting Dimensions Remote Ztron Level Control All dimensions in inches mm...

Страница 12: ...r to Figures 2 5 through 2 9 for the appropriate power wiring drawing and use the following procedure to wire the Ztron level control a Ensure that all power to the wiring is off b Remove the cover c...

Страница 13: ...502 3000 Series ZtronTM Point Level Control Installation 9 Figure 2 5 Wiring the 502 300X 120 Vac Electronic Unit...

Страница 14: ...502 3000 Series ZtronTM Point Level Control Installation 10 Figure 2 6 Wiring the 502 320X 24 Vdc Electronic Unit...

Страница 15: ...502 3000 Series ZtronTM Point Level Control Installation 11 Figure 2 7 Wiring the 502 330X 240 Vac Electronic Unit...

Страница 16: ...502 3000 Series ZtronTM Point Level Control Installation 12 Figure 2 8 Wiring the 502 340X 24 Vdc Isolated Electronic Unit...

Страница 17: ...502 3000 Series ZtronTM Point Level Control Installation 13 Figure 2 9 Wiring the 502 350X 12 Vdc Isolated Electronic Unit...

Страница 18: ...terminal strip on the electronic unit N C Normally Closed N O Normally Open Figure 2 10 Wiring the Relays LED ON 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 HIGH LEVEL FAI...

Страница 19: ...ntegral If the Ztron level control has the electronic unit mounted in the same housing as the sensing element integral mount the sensing element is prewired at the factory as shown in Figure 2 11 All...

Страница 20: ...harge that can damage the electronic unit If required a heavy duty spark protector is available as an option and will be prewired at the factory with integrally mounted Ztron level controls Figure 2 1...

Страница 21: ...the individual terminals on the side opposite the terminal strips See Figure 2 13 NOTE It is important that the sensing element cable is mechanically separated from the power wiring When installing re...

Страница 22: ...ions are made to the sensing element after it has been installed in the vessel with the condulet attached For two terminal sensing elements the shield wire is not used at the sensing element end and m...

Страница 23: ...k protection is supplied use the following instructions for installing the spark protector in the sensing element condulet See Figure 2 12 or 2 15 a Attach the mounting link on the spark protector to...

Страница 24: ...ure 3 1 NOTE This adjustment is a 35 turn potentiometer and does not have a mechanical stop A small click can be heard when the adjustment has been turned fully in either direction Turning the setpoin...

Страница 25: ...r Using a small screwdriver and turning in the clockwise direc tion the time delay adjustment is set from 0 to 90 seconds The delay applies only to recovery from the alarm condition With High Level Fa...

Страница 26: ...3 2 High Level Failsafe HLFS means the relay will de energize when level is high indicating high level upon loss of power N O contacts open N C contacts closed Low Level Failsafe LLFS means the relay...

Страница 27: ...for use in a hazardous location 4 1 Calibration in Conducting Material All Ztron controls except for model 502 3000 918 are factory set to switch in water based conducting materials setpoint adjustmen...

Страница 28: ...ent does not have a mechanical stop A small click can be heard when the adjust ment has been turned fully in either direction The LED on indicates that the relay is ener gized or in normal condition n...

Страница 29: ...t the factory for further options g Turn the adjustment back counterclockwise CCW one half the number of turns that were counted h Record number of turns and save for future calibration reference Cali...

Страница 30: ...Vertical Ztron Material Covering Sensing Element b Start from the full counterclockwise CCW position Turn the setpoint adjustment clockwise CW until the relay just operates LED changes states NOTE If...

Страница 31: ...l Drexelbrook representative or call the fac tory direct at 1 800 527 6297 US and Canada or 1 215 674 1234 International 5 2 Testing the Electronic Unit Use the following procedure to troubleshoot the...

Страница 32: ...of sensing element terminals See Figure 5 1 Center wire to ground __________ohms Center wire to shield __________ohms Shield to ground __________ohms d A new sensing element that is clean and not coat...

Страница 33: ...ance reading of less than 10 ohms on any sensing element terminal is usually due to a metal to metal short circuit Check that the sensing element is not touching any vessel structure Figure 5 1 Checki...

Страница 34: ...three conductors All readings should show an open circuit infinite resistance If resistance is measured the coax cable insulation is punctured or damaged d Check for continuity of each conductor Short...

Страница 35: ...igh or low level and one pair will be closed with high or low level Refer to Figures 2 10 and 5 2 Figure 5 2 Relay Circuit Operation b Relay operation may generally be heard as an audible click when t...

Страница 36: ...1 19 Remote Spark Protector tab screw 47 OHMS tab green wire OPEN CIRCUIT screw green wire OPEN CIRCUIT GREEN WIRE METAL TAB TO SENSING ELEMENT GREEN GROUND WIRE TO COAX CENTER CONDUCTOR TO COAX SHIEL...

Страница 37: ...ion material HLFS due to fill length Consult factory angle c Improper wiring c See section 2 d Improper calibration d See section 4 e Electronic unit malfunction e See section 5 2 f Open coax f See se...

Страница 38: ...___________ Pressure ______________________________________ Agitation______________________________________ Brief description of the problem _______________________ ___________________________________...

Страница 39: ...der Number for Repairs _____________________ Please include a purchase order even if the repair is under warranty If repair is covered under warranty you will not be charged Ship equipment freight pre...

Страница 40: ...dc input 3W maximum 12 Vdc Isolated Unit 402 3500 9 16 Vdc input 3W maximum Sensitivity 3pF or less Load Resistance Center to Ground 1500 ohms Center to Shield 750 ohms Shield to Ground 750 ohms Fails...

Страница 41: ...sing Element System Sensing Process Process Center Model Element Temperature Wetted Rod Number Model and Pressure Parts O D 502 3000 Number 700 901 206 101 250 F 200 psi1 316 SS and Epoxy 3 8 inch 002...

Страница 42: ...y Road Horsham PA 19044 US Sales 800 553 9092 24 Hour Service 800 527 6297 International 215 674 1234 Fax 215 674 2731 E mail deinfo drexelbrook com Web www drexelbrook com An ISO 9001 Certified Compa...

Отзывы: