18
Installation (Vent-Air Intake System Installation) continued-
5. Insert the straight end of the three (3) inch
(7.6 cm)
diameter elbow into
the flue reducer until firmly seated and oriented in the correct direction.
With a 1/8 inch diameter drill bit (not supplied), drill three (3) holes, 120
o
apart, through the flue reducer into the three (3) inch
(7.6 cm)
diameter
elbow. Fasten with three (3) #8 sheet metal screws (supplied). Using
the supplied special RTV silicone sealant, apply a sufficient amount to
seal the joint (See Figure 8).
Figure 8
6. Place the straight end of the five (5) inch
(12.7 cm)
diameter elbow over
the three (3) inch
(7.6 cm)
diameter elbow and plenum collar until seated
on top of the plenum box. Make certain that the five (5) inch
(12.7 cm)
diameter elbow is oriented in the same direction as the three (3) inch
(7.6 cm)
diameter elbow and both are oriented in the correct direction.
Drill three (3) 1/8 inch diameter holes, 120
o
apart, through the five (5)
inch
(12.7 cm)
diameter elbow into the plenum collar. Fasten with three
(3) #8 sheet metal screws (supplied) (See Figure 9).
IMPORTANT
The following instructions detail the installation of the standard
horizontal vent-air intake kit supplied with the water heater.
Содержание DIRECT VENT GAS WATER HEATER
Страница 10: ...10 Installation continued Figure 2 Figure 3 ...
Страница 15: ...15 Installation Horizontal and Vertical Vent Air Intake Lengths continued Figure 6 ...
Страница 27: ...27 Water Connections continued ...
Страница 37: ...37 DIRECT VENT WATER HEATER ...
Страница 38: ...38 VENT AIR INTAKE KITS ...
Страница 40: ...40 NOTES ...