6
7
8
18"
1
2
3
!
U
N
S
C
R
E
W
B
E
FO
R
E
IN
ST
A
LL
IN
G
4
5
2
MAKE WATER SUPPLY CONNECTIONS
4
TEST INSTALLED FAUCET
SPRAY OPERATION
3
Move HANDLE
(1)
into "off"
position.
With HANDLE
(1)
in "off" position,
unthread SPRAY
(3)
from HOSE
(2)
.
Turn on water supplies.
Operate handle back to front, in COLD
and HOT positions, to flush water lines
thoroughly.
Replace SPRAY
(3)
onto HOSE
(2)
.
With FAUCET on pull down
SPRAY
(4).
Check for leaks.
Make sure SPRAY
(4)
fully
retracks and is seated in
the SPOUT HOLDER
(5)
.
Check connections for leaks.
(See Section 5)
Turn off hot and cold water supplies before beginning.
Connect FLEXIBLE SUPPLIES
(1, 2)
directly
to wall supplies. Connection on fitting
supplies are 3/8" compression. Connect
left supply (Marked with a Red Stripe) to Hot
and right supply (Marked with Blue Stripe) to
Cold wall supply. Use adjustable wrench to
tighten connections. Do not over tighten.
Faucet supplies are 21" long from faucet base.
Note: If additional supply length is
required, installer must purchase
additional parts separately.
Important: If SUPPLY HOSES (1, 2) are
too long, loop as illustrated to avoid kinking.
1
2
COLD
HOT
M965243 REV. 1.8 (4/19)
REMOVE
CONNECT SPRAY HOSE & INSTALL WEIGHTS
Remove the FAUCET PROTECTION DEVICE
(1)
from the
COUPLING NUT
(2)
.
Connect threaded end of HOSE
(3)
to SPRAY HOSE
COUPLING NUT
(2)
from fitting. Use wrench to tighten.
With HAND SPRAY
(4)
seated in SPOUT
(5)
, install WEIGHT
(7)
onto HOSE
(6)
18 inches from the underside of the sink deck
and secure with SCREW
(8)
.
1
3
2
5
4