background image

4

754072-100 Rev. A

Everclean

™ 

/ Evolution

 5' x 32"

Everclean

™ 

/ Evolution

 5' x 36"

Everclean

™ 

/ Evolution

 6' x 36"

Everclean

™ 

/ Evolution

 Oval

2422L / V.068C

2771L / V.068C

7236L / V.068C

2425L / V.168C - RHO

 

2645L / V.068C

9261.019

9261.019

9271.019

 

 9266.018

751755-100

751755-100

751755-100

751755-100

Optional Components 

(Not Included)

Required Components 

(Not Included)

Apron

Kit

Tile Bead

Kit

1599.205.XXX

*

1599.205.XXX

*

1599.205.XXX

*

1583.470.XXX

 Drain

(Specify Finish)

List of Required Tools and Supplies:

Tools
•  Level
•  Tape Measure
•  Pipe Wrench
•  Slip Joint Pliers
•  Screw Driver
•  Standard Woodworking Tools
•  Personal Safety Equipment
•  Caulking Gun

Supplies
•  Nails
•  Putty
•  Caulking (waterproof)
•  1 x 4 Stringers
•  Drop Cloth
•  Cement, Plaster, Grout

General Installation Information

Carefully uncrate and inspect your new bath for any shipping damage. If such damage is found, report it 
to your vendor immediately. After inspection and during installation, protect the bath from construction 
damage. 

Before installation, and before enclosing with wallboard, tile, etc., the bath must be filled 

with water and operated to check for leaks that may have resulted from shipping damage or 
mishandling
! Do not make unauthorized modifications to the air bath system. This could adversely affect 
the safety and performance of the air bath and void the warranty. Do not handle or move the air bath by 
the air blower or piping system. Fittings (bath filler, shower arm, etc.) are not provided with the bath and 
must be ordered separately. Framing and enclosing materials are provided by others.

For electrical requirements, refer to section titled “Air Bath Electrical Installation Instructions”.

Check for availability of optional American Standard wall tiling bead (required for recess installation).
Protect all finished surfaces of the air bath during construction and installation using a drop cloth.

 

Description

Model Number

LIST OF OPTIONAL COMPONENTS (NOT INCLUDED):

* These models require American Standard Deep Soak Max Drain 1599.205

!

WARNING: Do not lift air bath by the piping harness at any time.

2425L / V.268C - LHO

NOT 

APPLICABLE

INTEGRAL

1599.205.XXX

*

Everclean

™ 

/ Evolution

 5' x 32" IA

Содержание EVERCLEAN 2422L.068C

Страница 1: ...pleasure from this product please follow the instructions and cautions MODEL 2422L 068C 5 x 32 2422V 068C MODEL 2771L 068C 5 x 36 2771V 068C MODEL 2645L 068C OVAL 2645V 068C MODEL 7236L 068C 6 x 36 7...

Страница 2: ...s Page 4 Specifications Page 5 Roughing in Reference Page 6 Framing and Support Instructions Page 7 Mounting Instructions Page 8 Electrical Connections Page 9 Remote Blower Location Option Page 10 Pos...

Страница 3: ...esulting in loss of consciousness or even drowning WARNING Pregnancy If you are or think you may be pregnant consult your physician before using the bathtub Never drop or insert any object into any op...

Страница 4: ...installation and before enclosing with wallboard tile etc the bath must be filled with water and operated to check for leaks that may have resulted from shipping damage or mishandling Do not make una...

Страница 5: ...34 1 2 876mm 72 3 16 1833mm x 34 1 2 876mm 60 3 16 1528mm x 30 1 2 774mm 66 3 16 1681mm x 34 1 2 876mm L 60 1524mm W 32 813mm H 21 1 2 546mm L 60 1524mm W 36 914mm H 21 1 2 546mm L 72 1829mm W 36 914...

Страница 6: ...60 1524mm 32 813mm 11 279mm 7 3 4 197mm 13 3 4 349mm 6 152mm 3 76mm 3 1 4 83mm CUT OUT IN FLOOR FOR DRAIN 72 1829mm 36 914mm 7 3 4 197mm 11 279mm 3 1 4 83mm 3 76mm 6 152mm 13 3 4 349mm CUT OUT IN FLOO...

Страница 7: ...th following the drain installation instructions Before replacing your air bath for final installation be certain that an opening has been provided in the sub floor for the drain See the roughing in d...

Страница 8: ...deck with the tub directly beneath it as damage to the tub may result 5 Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line 6 Replace the bath dec...

Страница 9: ...be routed away from the air blower AIR BATH ELECTRICAL INSTALLATION INSTRUCTIONS The air bath should be installed on a 120 vac 15 or 20 amp dedicated GFCI circuit The circuit should be hard wired from...

Страница 10: ...location Electrical connections should be performed by a licensed electrician The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the tot...

Страница 11: ...se Lestoil Lysol Disinfectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEV...

Страница 12: ...h time you wish to purge to activate At that precise time press and hold the second button on the keypad for 5 seconds all LEDs will flash twice The purge cycle will now start at the programmed time e...

Страница 13: ...ub and Tile Cleaner Windex Cleaner Mr Clean Cleaner Dow Disinfectant Bathroom Cleaner or other cleaning products in aerosol cans HARSH CHEMICALS SHARP AND ABRASIVE OBJECTS SHOULD NEVER BE USED ON ACRY...

Страница 14: ...l application 4 Options and accessories American Standard s limited warranty on these items is one year for parts only and excludes labor This one year limited warranty covers accessories manufactured...

Отзывы: