REMOTE BLOWER LOCATION OPTION 

IMPORTANT!

  

It is not necessary that the blower motor be relocated. This option is provided for the case that a particular    

 

 

 

installation makes this effort practical. 

 

NOTE:

  Relocating blower motor from factory installed location, see photo 

1, will require disassembly of air blower from mounting  

 

 

board. Keep all hardware for reattachment at new location. Additional hardware will be required depending upon final   

 

 

desired position of air blower. Follow all instructions listed below. 

NOTE:

  Installing the blower in a remote location will reduce the system efficiency. 

NOTE:

  Relocating a blower motor still requires a service access for the blower. 

NOTE:

  All materials needed for the relocation must be supplied by the installer. This includes ordering a longer control panel   

 

 

cable (754025-0073A), a longer flexible blower hose (753960-2030A), and up to two lighting cable extensions for combo  

 

 

models (754512-0070A). 

A separate circuit, which must be protected by the Ground Fault Circuit Interrupter (GFCI), is required in the remote location. 

Electrical connections should be performed by a licensed electrician. 

The blower motor must be located within 12 feet of rigid piping from the bath air manifold. This limitation is for the total pipe length 

and applies to any direction changes and elbows. There can be no more than six changes of direction. There should be as few 

direction changes as possible and the piping installation must meet all requirements of local plumbing and building codes. 

Disconnect the blower from the flexible hose as shown in photo 

2. Do NOT remove the check valve manifold that is mounted to the 

underside of the air bath. The manifold MUST remain mounted above the tub overflow level as shown in 

2.

Replace the flexible hose shown in photo 2 with the longer flexible hose (P/N 753960-2030A) using the existing hope clamps.

NOTE:  Do NOT remove the original cable coming out of the blower. Instead, plug the longer cable (P/N 754025-0073A) into the  

 

 

existing cable that is coming out of the blower as shown in photo 3. Then plug the remaining end of the longer cable into  

 

 

the control panel which remains on the tub wall.

1.

2.

3.

TYPICAL VIEW

TYPICAL VIEW

Do 

NOT move check 

valve manifold

TO CONTROL PANEL

754025-0073A CABLE

(INCLUDES ADAPTER 

BOX SHOWN)

TO BLOWER

EXISTING 

CABLE

Содержание EVERCLEAN 2422L.068C

Страница 1: ...pleasure from this product please follow the instructions and cautions MODEL 2422L 068C 5 x 32 2422V 068C MODEL 2771L 068C 5 x 36 2771V 068C MODEL 2645L 068C OVAL 2645V 068C MODEL 7236L 068C 6 x 36 7...

Страница 2: ...s Page 4 Specifications Page 5 Roughing in Reference Page 6 Framing and Support Instructions Page 7 Mounting Instructions Page 8 Electrical Connections Page 9 Remote Blower Location Option Page 10 Pos...

Страница 3: ...esulting in loss of consciousness or even drowning WARNING Pregnancy If you are or think you may be pregnant consult your physician before using the bathtub Never drop or insert any object into any op...

Страница 4: ...installation and before enclosing with wallboard tile etc the bath must be filled with water and operated to check for leaks that may have resulted from shipping damage or mishandling Do not make una...

Страница 5: ...34 1 2 876mm 72 3 16 1833mm x 34 1 2 876mm 60 3 16 1528mm x 30 1 2 774mm 66 3 16 1681mm x 34 1 2 876mm L 60 1524mm W 32 813mm H 21 1 2 546mm L 60 1524mm W 36 914mm H 21 1 2 546mm L 72 1829mm W 36 914...

Страница 6: ...60 1524mm 32 813mm 11 279mm 7 3 4 197mm 13 3 4 349mm 6 152mm 3 76mm 3 1 4 83mm CUT OUT IN FLOOR FOR DRAIN 72 1829mm 36 914mm 7 3 4 197mm 11 279mm 3 1 4 83mm 3 76mm 6 152mm 13 3 4 349mm CUT OUT IN FLOO...

Страница 7: ...th following the drain installation instructions Before replacing your air bath for final installation be certain that an opening has been provided in the sub floor for the drain See the roughing in d...

Страница 8: ...deck with the tub directly beneath it as damage to the tub may result 5 Remove the bath deck and apply a generous bead of waterproof sealant on the outer edge of the traced line 6 Replace the bath dec...

Страница 9: ...be routed away from the air blower AIR BATH ELECTRICAL INSTALLATION INSTRUCTIONS The air bath should be installed on a 120 vac 15 or 20 amp dedicated GFCI circuit The circuit should be hard wired from...

Страница 10: ...location Electrical connections should be performed by a licensed electrician The blower motor must be located within 12 feet of rigid piping from the bath air manifold This limitation is for the tot...

Страница 11: ...se Lestoil Lysol Disinfectant spray or concentrate or Lysol Basin Tub and Tile Cleaner Windex Mr Clean Dow Disinfectant Bathroom Cleaner or cleaning products in aerosol cans HARSH CHEMICALS SHOULD NEV...

Страница 12: ...h time you wish to purge to activate At that precise time press and hold the second button on the keypad for 5 seconds all LEDs will flash twice The purge cycle will now start at the programmed time e...

Страница 13: ...ub and Tile Cleaner Windex Cleaner Mr Clean Cleaner Dow Disinfectant Bathroom Cleaner or other cleaning products in aerosol cans HARSH CHEMICALS SHARP AND ABRASIVE OBJECTS SHOULD NEVER BE USED ON ACRY...

Страница 14: ...l application 4 Options and accessories American Standard s limited warranty on these items is one year for parts only and excludes labor This one year limited warranty covers accessories manufactured...

Отзывы: