754063-100 Rev. B
11
DRAIN CONNECTION
continued...
8. Have assistant take drain assembly from step 6 and place over back surface of drain hole to engage the metal strainer bolt.
Secure plastic drain base to metal strainer in drain opening using nut driver shaft. DO NOT OVER TIGHTEN! Carefully
remove excess silicone from acrylic surface as directed by silicone sealant directions.
9. From unit back side, overflow nut should be in alignment with overflow opening, as shown in photo F.
10. Slide air bath fitting nut, washer and gasket onto air bath fitting as shown in photos G
and
H.
11. Assemble air bath fitting to plastic drain base as shown in photos I, J, K and L. Hand tighten nut to create watertight joint.
F.
G.
H.
I.
J.
K.
L.
Overflow nut
O-ring
Air bath
fitting