background image

M 9 6 8 9 8 6   Rev.  1. 3

2

MAKE WATER SUPPLY CONNECTIONS

4

TEST INSTALLED FAUCET

3

INSTALL WEIGHTS

Move HANDLE 

(1)

 down into 

"off" position.

With HANDLE 

(1)

 down in "off" position,

unthread SPRAY FACE 

(3)

 from SPRAY 

(2)

.

Turn on water supplies.

Operate handle up and down, in COLD

and HOT positions, to flush water lines

thoroughly.

Check HAND SPRAY 

(2)

 operation:

With faucet on pull SPRAY FACE 

(3)

 down to switch

from stream to spray.

Replace SPRAY FACE 

(3)

 onto SPRAY 

(2)

.

With HAND SPRAY 

(1)

 seated in FAUCET 

(2)

install WEIGHTS 

(4)

 onto HOSE 

(3)

 using two

SCREWS 

(5)

. Locate the WEIGHTS 

(4)

 two feet (2')

from the underside of the sink deck.

Tighten SCREWS 

(5)

 firmly. 

Install SEAL WASHER 

(6)

 into COUPLING NUT 

(7)

.

Tighten COUPLING NUT 

(7)

 to HOSE END 

(3a)

.  

Check connections for leaks.

(See Section 5)

3

2

2

1

2

COLD

HOT

Turn off hot and cold water supplies before beginning.
Connect FLEXIBLE SUPPLIES 

(1, 2)

 directly

to wall supplies. Connection on fitting

supplies are 3/8" compression. Connect

left supply (Marked with a Red Stripe) to Hot

and right supply (Marked with Blue Stripe) to 

Cold wall supply. Use adjustable wrench to 

tighten connections. Do not over tighten.

Faucet supplies are 21" long from faucet base.

Note: If additional supply length is

required, installer must purchase

additional parts separately.

Important: If SUPPLY HOSES (1, 2) are

too long, loop as illustrated to avoid kinking.

3

3a

7

6

4

5

1

2

24"

1

3

PULL SPRAY FACE 

(3)

DOWN TO SWITCH FROM

STREAM TO SPRAY

REMOVE

Отзывы: