american flame AFVK-SP Скачать руководство пользователя страница 10

American Flame AFVK-SP Valve Kits

REV. 10-8-19 Page 10

FOR YOUR SAFETY READ BEFORE LIGHTING

WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT 

CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.

1.  This installation should be installed with provisions for combustion and ventilation air, must conform with local codes 

or in the absence of local codes to the national fuel Gas Code ANSI Z223 latest addition.

2.  This product must be on a gas supply line that is less than 1/2 psi. and an individual manual shut-off.

3.  Never operate this new system with the glass fireplace enclosures (doors) in the closed position.

4.  Connecting 120-volt electrical power to a valve kit directly will cause damage and will void warranty.  An optional AF-

4000ADP24 adapter (step-down transformer 120VAC to 7.5VDC) can be installed to eliminate batteries.  The battery 

pack must remain connected to enable the solenoid or motor drive operation however the batteries can be removed.

NOTE: 

 VALVE BOX MUST BE LOCATED A MINIMUM OF 2-INCHES FROM SIDES OF THE BASKET GRATE AND 

NEVER PLACED DIRECTLY IN FRONT OR BEHIND THE BASKET GRATE

OPERATING PROCEDURE

After installation is completed follow these steps to operate the AFVK-SP.

1.  Turn ON the main gas supply and check all fittings and connections for leaks with soap and water solution.

2.  Move the OFF/REMOTE slide switch on the face plate of valve box to the REMOTE position. See Fig. 20. Push the 

ON

 button on the remote transmitter this will start the ignition system. The pilot will begin to spark and then light. Once 

the pilot is lit 2 seconds the main burner will light.

3.  Adjust the main flame from 

HI

 to 

LO

 with the manual HI/LO knob on front of valve kit.

Note:

 Move the OFF/REMOTE slide switch on the face plate of valve box to the OFF position then push the rocker switch 

to the “I” position this will manually start the ignition system. Once the pilot is lit 2 seconds the main burner will light.

 

After the installation is complete follow these steps to operate the AFVK-SP-HL & AFVK-SP-MHL

1.  Turn on the main gas supply and check all fittings and connections for leaks with soap and water solution.

2.  Move the OFF/REMOTE slide switch on the front to the REMOTE position. See Fig. 12.  Push the ON button on the 

remote transmitter position this will start the ignition system. The pilot will begin to spark and then light once the pilot 

is lit 2 seconds later the main burner will light.

3.  Adjust the main flame from HI to LO with the HI/LO buttons on the remote transmitter.

Note:

 Move the OFF/REMOTE slide switch on the face plate of the valve boxto the OFF position then push the rocker 

switch to the “I” position this will manually start the ignition system. Once the pilot is lit 2 seconds the main burner will 

light.

Note:

 On the AFVK-SP-H/L press and release the LO button and the flame will go to LO. Press and release the HI button 

and the flame will go to HI.

 

Note:

 On the AFVK-SP-MH/L press and hold the LO button and the flame will modulate to LO. Press and hold the HI 

button and the flame will modulate to HI.  

 

Note:

 On initial start up: due to air in the gas supply line it may take an extended amount of time for the pilot to light. 

There is a 60 second lockout built into the module. To reset turn the rocker switch OFF then ON or push the OFF button 

on the remote transmitter then push the ON button.

Содержание AFVK-SP

Страница 1: ...tice Please leave these instructions for the consumer Retain for future reference Models AFVK SP AFVK SP HL AFVK SP MHL Electronic Safety Pilot System for Vented Gas Logs IF YOU CANNOT READ OR UNDERST...

Страница 2: ...Set Page 5 Reference Section Wiring Diagram Page 6 Battery Pack Preparation Page 7 Gas Conversion Page 8 Operation of System Page 9 10 Troubleshooting Page11 Replacement Parts Page 12 Warranty Page12...

Страница 3: ...Solenoid ON Remote Switch Continious Pilot On Off Switch AFVK SP HL Side View inside box Fig 4 AFVK SP HL Hi Lo Solenoid SP1001HL trans mitter damper clamp flex line adapter fitting includes battery p...

Страница 4: ...et gas supply 9 Bend 12 stainless flex line and connect it to the valve outlet then connect other end to 3 8 flare fitting to existing burner pan Caution Ensure no gas line inlet or outlet are placed...

Страница 5: ...ilot tubing from pilot assembly until the bottom of the pilot bracket is resting against the pan This will hold the pilot at the 45 position Use caution when bending pilot tubing not to kink the tubin...

Страница 6: ...itor Wires Fig 11 Module Identification IN PILOT OUT PILOT ADJ MAIN MAIN 2 Pin Connector Green White Wires PILOT 2 Pin Connector Orange White Wires Pilot Ass y Fig 12 Gas Valve Identification OUT PILO...

Страница 7: ...r on the battery pack comes pre installed to the 4 pin female connector located on the battery pack and module Note Figs 14 16 for reference 2 The AFVK SP HL AFVK SP MHL also has 2 18 wires Red Black...

Страница 8: ...ROPANE it will be necessary to use the LPK 18 or LPK 24 1 The AFVK SP AFVK SP HL or AFVK SP MHL electronic control valves are convertible from Natural gas to Propane gas by simply turning the stem kno...

Страница 9: ...OFF OFF REMOTE ON OFF CONTINUOUS PILOT Fig 20 Valve box switches Fig 21 Remote control Continuous button 2 REMOTE CONTROL FEATURE The AFVK SP AFVK SP HL or AFVK SP MHL comes with a remote control tra...

Страница 10: ...ilot is lit 2 seconds the main burner will light 3 Adjust the main flame from HI to LO with the manual HI LO knob on front of valve kit Note Move the OFF REMOTE slide switch on the face plate of valve...

Страница 11: ...e continuous pilot switch to the OFF position MAIN BURNER DOES NOT COME ON WHEN THE MANUAL ROCKER SWITCH OR REMOTE CONTROL IS TURNED ON 1 Confirm that the pilot sparks and lights 2 Check the 2 pin pla...

Страница 12: ...tinuous Pilot Off On AUX OUT PILOT ADJ IN MAIN PILOT 10 11 LIMITED WARRANTY American Flame warrants the AFVK SP AFVK SP HL or AFVK SP MHL Valve Kit for 12 months from the date of purchase or installat...

Отзывы: