11
10. The dryer
must be
installed with provisions for adequate combustion and make-up air supply.
CAUTION:
This dryer produces combustible lint and
must be
exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint build up.
IMPORTANT: Dryer must be installed in a location/environment, which the ambient
temperature remains between 40º F (4.44º C) and 130º F (54.44º C).
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap and/or optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid
the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts
located in the lint chamber area, remove the front panel.
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) square metal shims or other suitable material under the base
pads. It is suggested that the dryer be tilted slightly to the rear (refer to the
illustration above
).
Содержание Phase 7 / OPL ensor Activated Fire Extinguishing System D120
Страница 23: ...19 ...
Страница 56: ...ADC Part No 113179 3 09 11 08 5 ...